S
Study
Academic Library
Search
Dashboard
Shelves
Open access
My library
Review
Jiayuan Wang · Study
Home
/
Author
Jiayuan Wang
9 works
· latest 2019
· 1 institutions
cluster: provisional
Works
9 shown
Fuzzy Logic–Based Method for Risk Assessment of Belt and Road Infrastructure Projects
Journal of Construction Engineering and Management
·
2019
·
4 authors
55
citations
THE COST PERFORMANCE AND CAUSES OF OVERRUNS IN INFRASTRUCTURE DEVELOPMENT PROJECTS IN ASIA
Journal of Civil Engineering and Management
·
2019
·
4 authors
·
Open access
61
citations
Identifying the Critical Risks in Railway Projects Based on Fuzzy and Sensitivity Analysis: A Case Study of Belt and Road Projects
Sustainability
·
2019
·
2 authors
·
Open access
46
citations
Collaboration between designers and contractors to improve building energy performance
Journal of Cleaner Production
·
2019
·
4 authors
46
citations
Schedule risk analysis of infrastructure projects: A hybrid dynamic approach
Automation in Construction
·
2018
·
5 authors
88
citations
System Dynamics Approach for Investigating the Risk Effects on Schedule Delay in Infrastructure Projects
Journal of Management in Engineering
·
2016
·
2 authors
126
citations
The mediation role of trust in knowledge sharing
Engineering Construction & Architectural Management
·
2013
·
3 authors
27
citations
Factors affecting contractors’ risk attitudes in construction projects: Case study from China
International Journal of Project Management
·
2010
·
2 authors
216
citations
Understanding the key risks in construction projects in China
International Journal of Project Management
·
2007
·
3 authors
861
citations