SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
An integrated survey of project scheduling
0 references·2 citing·5 second hop
An integrated survey of project scheduling (1997)An integrated survey of project schedulingConstraint-based schedule repair for product development projects with time-limited constraints (2004)Constraint-based schedule rep…Maximizing the Net Present Value of a Project Under Resource Constraints Using a Lagrangian Relaxation Based Heuristic with Tight Upper Bounds (2001)Maximizing the Net Present Va…Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)PSPLIB - A project scheduling problem library (1997)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Multi-mode project payment scheduling problems with bonus–penalty structure (2007)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2001Maximizing the Net Present Value of a Project Under Resource Constraints Using a Lagrangian Relaxation Based Heuristic with Tight Upper Bounds49 cited
  • 2004Constraint-based schedule repair for product development projects with time-limited constraints40 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work