SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Factors influencing reworks occurrence in construction: a study of selected building projects in Nigeria
10 references·2 citing·44 second hop
Factors influencing reworks occurrence in construction: a study of selected building projects in Nigeria (2010)Factors influencing reworks occurrence in…Contract Documentation and the Incidence of Rework in Projects (2005)Contract Documentation and th…Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects (2002)Influence of Project Type and…Illustrative Benchmarking Rework and Rework Costs in Swedish Construction Industry (2002)Illustrative Benchmarking Rew…Construction related factors influencing the choice of concrete floor systems (2002)Construction related factors …Auditing the indirect consequences of rework in construction: a case based approach (2002)Auditing the indirect consequ…Improving the Design-Construction Interface (1998)Improving the Design-Construc…Some observations on the issues of quality cost in construction (1997)Some observations on the issu…Factors influencing construction time and cost overruns on high-rise projects in Indonesia (1997)Factors influencing construct…The role of system dynamics in project management (1996)The role of system dynamics i…Causes of Quality Deviations in Design and Construction (1992)Causes of Quality Deviations …Causal model for rework in building construction for developing countries (2021)Causal model for rework in bu…A rework probability model: a quantitative assessment of rework occurrence in construction projects (2015)A rework probability model: a…Mixing Qualitative and Quantitative Methods: Triangulation in Action (1979)Case Study Research: Design and Methods (1984)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Benchmarking, Benchaction, and Benchlearning: Rework Mitigation in Projects (2003)Learning to Reduce Rework in Projects: Analysis of Firm's Organizational Learning and Quality Practices (2003)Standardizing Housing Defects: Classification, Validation, and Benefits (2012)The Survey Research Handbook. (1986)The survey research handbook (1990)Questionnaire Design, Interviewing and Attitude Measurement (1993)Probability distribution fitting of schedule overruns in construction projects (2013)Tales on the dark side of the transport infrastructure provision: a systematic literature review of the determinants of cost overruns (2019)Critical success factors for large building construction projects (2020)Introduction to Factor Analysis: What It Is and How to Do It. (1980)Modelling global risk factors affecting construction cost performance (2003)Significant factors causing delay in the UAE construction industry (2006)Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries (2008)Applied Cost Engineering (1996)Assessing quality relationships in public housing (2006)A survey on the advancement of QA (quality assurance) to TQM (total quality management) for construction contractors in Hong Kong (2009)Assessment of the expected cost of quality (COQ) in construction projects in Egypt using artificial neural network model (2012)Survey Research Methods. (1985)Practical Research: Planning and Design (1990)A quantitative assessment of the cost and time impact of variation orders on construction projects (2007)Survey Research Methods (2012)Importance and ranking evaluation of delay factors for development construction projects in Benin (2013)Empirical study of schedule delay in Moroccan construction projects (2018)The Anatomy of Major Projects: A Study of the Reality of Project Management (1988)The Fifth Discipline (1990)The Fifth Discipline Fieldbook (1994)Determining the causal structure of rework influences in construction (1999)Systems thinking in innovation project management: A match that works (2011)Analysing the organizational factors of project complexity using structural equation modelling (2014)Quantifying the causes and costs of rework in construction (2000)A seamless supply chain management model for construction (2004)Yin, Robert K., Case Study Research: Design and Methods, 2nd ed. Newbury Park, CA: Sage, 1994. (1994)Analyzing Causes for Reworks in Construction Projects in China (2014)Aggregation of factors causing cost overruns and time delays in large public construction projects (2017)Revisiting Quality Failure Costs in Construction (2017)Total quality management in the construction process (1997)Taxonomy for change causes and effects in construction projects (2008)Measuring the Impact of Rework on Construction Cost Performance (2009)Defects and rework in new build: an analysis of the phenomenon and drivers (2007)Overlapping design and construction activities and an optimization approach to minimize rework (2013)A fuzzy model for evaluating risk impacts on variability between contract sum and final account in government-funded construction projects (2015)
this work references cited by second hop

References

  • 1997Factors influencing construction time and cost overruns on high-rise projects in Indonesia699 cited
  • 2002Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects464 cited
  • 1992Causes of Quality Deviations in Design and Construction430 cited
  • 1996The role of system dynamics in project management240 cited
  • 2002Illustrative Benchmarking Rework and Rework Costs in Swedish Construction Industry214 cited
  • 2002Construction related factors influencing the choice of concrete floor systems120 cited
  • 2002Auditing the indirect consequences of rework in construction: a case based approach119 cited
  • 1998Improving the Design-Construction Interface86 cited
  • 2005Contract Documentation and the Incidence of Rework in Projects72 cited
  • 1997Some observations on the issues of quality cost in construction44 cited

Cited by

  • 2015A rework probability model: a quantitative assessment of rework occurrence in construction projects36 cited
  • 2021Causal model for rework in building construction for developing countries30 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work