Predicting Contract Duration for Building Construction: Is Bromilow’s Time-Cost Model a Panacea?
16 references·0 citing·39 second hop
Predicting Contract Duration for Building Construction: Is Bromilow’s Time-Cost Model a Panacea? (2015)Predicting Contract Duration for Building…Time–cost relationship for predicting construction duration (2013)Time–cost relationship for pr…Estimating time performance for building construction projects in Vietnam (2013)Estimating time performance f…Estimating Performance Time for Construction Projects (2007)Estimating Performance Time f…Time‐cost model for building projects in Nigeria (2006)Time‐cost model for building …Approximately predicting the cost and duration of school reconstruction projects in Taiwan (2006)Approximately predicting the …Time–Cost Relationships in Australian Building Construction Projects (2005)Time–Cost Relationships in Au…Forecast models for actual construction time and cost (2003)Forecast models for actual co…Time–cost relationship of public sector projects in Malaysia (2001)Time–cost relationship of pub…The predictive ability of Bromilow's timecost model (2001)The predictive ability of Bro…Modelling building durations in Hong Kong (1999)Modelling building durations …Modelling and predicting construction durations in Hong Kong public housing (1999)Modelling and predicting cons…Determinants of construction duration (1995)Determinants of construction …An investigation into construction time performance (1995)An investigation into constru…Questionnaire Design, Interviewing and Attitude Measurement (1993)Questionnaire Design, Intervi…Relationship between value and duration of construction projects (1991)Relationship between value an…The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects (1985)The role of managerial action…A theory of human motivation. (1943)Which procurement system? Towards a universal procurement selection technique (1988)The Management of Innovation (1994)Application of Delphi method in selection of procurement systems for construction projects (2001)PROBLEMS OF PROJECTS AND EFFECTS OF DELAYS IN THE CONSTRUCTION INDUSTRY OF PAKISTAN (2012)A THEORY OF HUMAN MOTIVATION (2017)The Survey Research Handbook. (1986)The survey research handbook (1990)Cost Overruns in Hydrocarbon Megaprojects: A Critical Review and Implications for Research (2015)Identifying the key process factors affecting project performance (2016)Economics: principles and policy (1963)Economics--principles and policy (1979)Compressing construction durations: lessons learned from Hong Kong building projects (2002)Analysis of the Design-Build Delivery Method in Air Force Construction Projects (2009)PCIM: Project Control and Inhibiting-Factors Management Model (2012)Risk and Value in Privately Financed Health Care Projects (2012)Kaizen: The key to Japan‚s competitive success (2009)Moving Beyond Optimism Bias and Strategic Misrepresentation: An Explanation for Social Infrastructure Project Cost Overruns (2011)Analysis of factors critical to construction project success in Malaysia (2012)Analysing delay causes and effects in Ghanaian state housing construction projects (2015)A study of the factors affecting construction durations in Hong Kong (1995)Cost performance for building construction projects in Klang Valley (2010)The performance measurement of construction projects managed by ISO-certified contractors in Malaysia (2010)Measuring Project Management Performance: Case of Construction Industry (2017)Decision Criteria in Contractor Prequalification (1988)An evaluation of construction time performance in the building industry (1996)Important causes of delay in public utility projects in Saudi Arabia (1999)The impact of contractors' management capability on cost and time performance of construction projects in Nigeria (2009)Factors causing cost variation for constructing wastewater projects in Egypt (2012)Probability distribution fitting of schedule overruns in construction projects (2013)Collecting data using a semi‐structured interview: a discussion paper (1994)Survey research in operations management: a process‐based perspective (2002)Selecting, designing, and developing your questionnaire (2004)Using Intelligent Techniques in Construction Project Cost Estimation: 10-Year Survey (2014)Rethinking construction cost overruns: cognition, learning and estimation (2014)Cost overruns of public sector construction projects: a developing country perspective (2019)Developing a benchmark model for project construction time performance in Hong Kong (2003)A Survey of Factors Influencing the Productivity of Construction Operatives in the State of Qatar (2012)Motivational Factors Impacting the Productivity of Construction Master Craftsmen in Kuwait (2012)
this work references cited by second hop

References

  • 1993Questionnaire Design, Interviewing and Attitude Measurement4,974 cited
  • 1995An investigation into construction time performance180 cited
  • 1985The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects155 cited
  • 2003Forecast models for actual construction time and cost146 cited
  • 2005Time–Cost Relationships in Australian Building Construction Projects136 cited
  • 2006Time‐cost model for building projects in Nigeria132 cited
  • 2001Time–cost relationship of public sector projects in Malaysia127 cited
  • 1991Relationship between value and duration of construction projects126 cited
  • 1995Determinants of construction duration106 cited
  • 2007Estimating Performance Time for Construction Projects95 cited
  • 2001The predictive ability of Bromilow's timecost model77 cited
  • 1999Modelling building durations in Hong Kong54 cited
  • 1999Modelling and predicting construction durations in Hong Kong public housing53 cited
  • 2006Approximately predicting the cost and duration of school reconstruction projects in Taiwan42 cited
  • 2013Estimating time performance for building construction projects in Vietnam

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

40 cited
  • 2013Time–cost relationship for predicting construction duration38 cited
  • Cited by

    No citing works inside the corpus for this window.