Resource Leveling in Line-of-Balance Scheduling
16 references·6 citing·27 second hop
Resource Leveling in Line-of-Balance Scheduling (2013)Resource Leveling in Line-of-Balance Sche…Use of Genetic Algorithms in Resource Scheduling of Construction Projects (2004)Use of Genetic Algorithms in …Resource Scheduling Using Neural Dynamics Model of Adeli and Park (2001)Resource Scheduling Using Neu…Optimizing Resource Utilization for Repetitive Construction Projects (2001)Optimizing Resource Utilizati…Resource leveling in construction by genetic algorithm-based optimization and its decision support system application (2000)Resource leveling in construc…Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Optimization of Resource Allo…GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)GA-Based Multicriteria Optima…Scheduling Projects with Repeating Activities (1998)Scheduling Projects with Repe…Linear Scheduling Model: Development of Controlling Activity Path (1998)Linear Scheduling Model: Deve…Scheduling/Cost Optimization and Neural Dynamics Model for Construction (1997)Scheduling/Cost Optimization …Construction Resource Scheduling with Genetic Algorithms (1996)Construction Resource Schedul…RPM: Repetitive Project Modeling (1990)RPM: Repetitive Project Model…Packing Method for Resource Leveling (Pack) (1990)Packing Method for Resource L…Resource Leveling in Construction by Optimization (1989)Resource Leveling in Construc…Line‐of‐Balance Scheduling in Pavement Construction (1986)Line‐of‐Balance Scheduling in…Linear Scheduling Method for Highway Construction (1981)Linear Scheduling Method for …Precedence and Arrow Networking Techniques for Construction (1980)Precedence and Arrow Networki…Project Risk in the Context of Construction Schedules—Combined Monte Carlo Simulation and Time at Risk (TaR) Approach: Insights from the Fort Bema Housing Estate Complex (2022)Project Risk in the Context o…A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic (2019)A constraint programming appr…Improving workflow and resource usage in construction schedules through location-based management system (LBMS) (2018)Improving workflow and resour…Improved Adaptive Harmony Search algorithm for the Resource Leveling Problem with minimal lags (2017)Improved Adaptive Harmony Sea…Linear scheduling with multiple crews based on line-of-balance and productivity scheduling method with singularity functions (2016)Linear scheduling with multip…A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags (2016)A Parallel Branch and Bound A…Professional Construction Management (1976)Challenges in Line-of-Balance Scheduling (2002)Optimal Planning and Scheduling for Repetitive Construction Projects (2005)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)Project scheduling with resource constraints: A branch and bound approach (1987)Some efficient multi-heuristic procedures for resource-constrained project scheduling (1990)Optimizing Construction Time and Cost Using Ant Colony Optimization Approach (2008)Metaheuristics for project and construction management – A state-of-the-art review (2011)A review of methods and algorithms for optimizing construction scheduling (2013)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Multiple Attribute Decision Making (1981)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Particle swarm optimization-based schemes for resource-constrained project scheduling (2004)Multi-mode resource-constrained discrete time–cost-resource optimization in project scheduling using non-dominated sorting genetic algorithm (2012)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Fuzzy critical chain method for project scheduling under resource constraints and uncertainty (2007)Project Management With Cpm, Pert and Precedence Diagramming (1983)Schedule Optimization Using Genetic Algorithms (1991)Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Optimization of construction time-cost trade-off analysis using genetic algorithms (1999)Multiobjective Linear Programming Model for Scheduling Linear Repetitive Projects (2007)A genetic algorithm-based method for scheduling repetitive construction projects (2009)A Novel Machine Learning Model for Estimation of Sale Prices of Real Estate Units (2015)Cost Optimization in Projects with Repetitive Nonserial Activities (2001)Construction Project Scheduling (1991)Stochastic Construction Time-Cost Trade-Off Analysis (2000)
this work references cited by second hop

References

  • 1999Optimization of Resource Allocation and Leveling Using Genetic Algorithms421 cited
  • 1998Scheduling Projects with Repeating Activities309 cited
  • 1996Construction Resource Scheduling with Genetic Algorithms241 cited
  • 1999GA-Based Multicriteria Optimal Model for Construction Scheduling232 cited
  • 1997Scheduling/Cost Optimization and Neural Dynamics Model for Construction224 cited
  • 1989Resource Leveling in Construction by Optimization190 cited
  • 2004Use of Genetic Algorithms in Resource Scheduling of Construction Projects184 cited
  • 1990RPM: Repetitive Project Modeling176 cited
  • 1998Linear Scheduling Model: Development of Controlling Activity Path168 cited
  • 1980Precedence and Arrow Networking Techniques for Construction167 cited
  • 2001Optimizing Resource Utilization for Repetitive Construction Projects161 cited
  • 2000Resource leveling in construction by genetic algorithm-based optimization and its decision support system application160 cited
  • 1981Linear Scheduling Method for Highway Construction159 cited
  • 2001Resource Scheduling Using Neural Dynamics Model of Adeli and Park150 cited
  • 1986Line‐of‐Balance Scheduling in Pavement Construction

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

148 cited
  • 1990Packing Method for Resource Leveling (Pack)141 cited
  • Cited by

    • 2016Linear scheduling with multiple crews based on line-of-balance and productivity scheduling method with singularity functions54 cited
    • 2017Improved Adaptive Harmony Search algorithm for the Resource Leveling Problem with minimal lags52 cited
    • 2019A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic51 cited
    • 2022Project Risk in the Context of Construction Schedules—Combined Monte Carlo Simulation and Time at Risk (TaR) Approach: Insights from the Fort Bema Housing Estate Complex47 cited
    • 2018Improving workflow and resource usage in construction schedules through location-based management system (LBMS)46 cited
    • 2016A Parallel Branch and Bound Algorithm for the Resource Leveling Problem with Minimal Lags41 cited