SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Integrating Chaotic Initialized Opposition Multiple-Objective Differential Evolution and Stochastic Simulation to Optimize Ready-Mixed Concrete Truck Dispatch Schedule
12 references·0 citing·52 second hop
Integrating Chaotic Initialized Opposition Multiple-Objective Differential Evolution and Stochastic Simulation to Optimize Ready-Mixed Concrete Truck Dispatch Schedule (2015)Integrating Chaotic Initialized Oppositio…Discrete Event System Simulation (2024)Discrete Event System Simulat…Opposition-Based Multiple-Objective Differential Evolution to Solve the Time–Cost–Environment Impact Trade-Off Problem in Construction Projects (2014)Opposition-Based Multiple-Obj…Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization (2013)Solution to the Time-Cost-Qua…Discrete-Event Simulation for Estimating Emissions from Construction Processes (2013)Discrete-Event Simulation for…Time, Cost, and Environmental Impact Analysis on Construction Operation Optimization Using Genetic Algorithms (2011)Time, Cost, and Environmental…Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling (2011)Ant Colony Optimization for M…Methodology for Conducting Discrete-Event Simulation Studies in Construction Engineering and Management (2009)Methodology for Conducting Di…Using Elitist Particle Swarm Optimization to Facilitate Bicriterion Time-Cost Trade-Off Analysis (2007)Using Elitist Particle Swarm …MACROS: Multiobjective Automated Construction Resource Optimization System (2006)MACROS: Multiobjective Automa…HKCONSIM : A Practical Simulation Solution to Planning Concrete Plant Operations in Hong Kong (2003)HKCONSIM : A Practical Simula…Simulation of Concrete Batch Plant Production (2001)Simulation of Concrete Batch …Probabilistic Simulation Studies for Repetitive Construction Processes (1990)Probabilistic Simulation Stud…Project management with time, cost, and quality considerations (1996)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)A review of research on cost of quality models and best practices (2006)Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Integrating Quality and Safety in Construction Scheduling Time-Cost Trade-Off Model (2020)Development of discrete opposition-based NSGA-III model for optimizing trade-off between discrete time, cost, and resource in construction projects (2024)A Network Flow Computation for Project Cost Curves (1961)Project Management With Cpm, Pert and Precedence Diagramming (1983)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Multiobjective Optimization of Time-Cost Trade-Off Using Harmony Search (2009)Stochastic Time-Cost-Resource Utilization Optimization Using Nondominated Sorting Genetic Algorithm and Discrete Fuzzy Sets (2009)Latin hypercube sampling-based NSGA-III optimization model for multimode resource constrained time–cost–quality–safety trade-off in construction projects (2020)Introduction to simulation and SLAM II (1979)Simulation Modeling and Analysis. (1983)Discrete-Event System Simulation (1984)Probability Distribution Functions for Construction Simulation (2000)Optimizing an Equity Capital Structure Model for Public–Private Partnership Projects Involved with Public Funds (2017)Performance analysis of simulation-based optimization of construction projects using High Performance Computing (2018)Planning and analysis of construction operations (1992)Simulation of Concrete Paving Operations on Interstate-74 (2007)Integrating Messy Genetic Algorithms and Simulation to Optimize Resource Utilization (2009)Information Integration for Concurrent Engineering (IICE) IDEF3 Process Description Capture Method Report (1995)Simplified Discrete-Event Simulation Approach for Construction Simulation (2003)Optimized concrete delivery scheduling using combined simulation and genetic algorithms (2005)Real-time decision support for planning concrete plant operations enabled by integrating vehicle tracking technology, simulation, and optimization algorithms (2007)Materials Handling System Simulation in Precast Viaduct Construction: Modeling, Analysis, and Implementation (2008)Exceptional Paper—Probability Encoding in Decision Analysis (1975)Simulation modeling and analysis (1999)A mixed methods research design for bridging the gap between research and practice in construction safety (2014)How can ‘tasks made ready’ during lookahead planning impact reliable workflow and project duration? (2015)Schedule risk analysis of infrastructure projects: A hybrid dynamic approach (2018)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Cost Optimization in Projects with Repetitive Nonserial Activities (2001)Time, Cost, and Quality in a Road Building Project (2009)Genetic Algorithms for Optimization of Resource Allocation in Large Scale Construction Project Management (2010)System reliability theory based multiple-objective optimization model for construction projects (2012)Uncertainty (1990)A Guide to the project management body of knowledge (1996)Factors Affecting Time Overruns in Public Construction Projects: The Case of Jordan (2013)A many-objective optimization model for construction scheduling (2019)Optimization of environmental impacts of construction projects: a time–cost–quality trade-off approach (2020)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Ant colony optimization for resource-constrained project scheduling (2002)Hybridization of genetic algorithm and fully informed particle swarm for solving the multi-mode resource-constrained project scheduling problem (2016)Scheduling resource-constrained project problem with alternative activity chains (2017)Integrated multi-project planning and scheduling - a multiagent approach (2022)Introduction to Queueing Theory. (1982)A simulation-based risk network model for decision support in project risk management (2011)Simulation for manufacturing system design and operation: Literature review and analysis (2014)An Empirical Analysis of Queuing Model and Queuing Behaviour in Relation to Customer Satisfaction at Jkuat Students Finance Office (2015)Stochastic Simulation Optimization with Optimal Computing Budget Allocation (2024)
this work references cited by second hop

References

  • 2024Discrete Event System Simulation1,043 cited
  • 2009Methodology for Conducting Discrete-Event Simulation Studies in Construction Engineering and Management136 cited
  • 2007Using Elitist Particle Swarm Optimization to Facilitate Bicriterion Time-Cost Trade-Off Analysis121 cited
  • 2001Simulation of Concrete Batch Plant Production105 cited
  • 2011Time, Cost, and Environmental Impact Analysis on Construction Operation Optimization Using Genetic Algorithms96 cited
  • 2013Solution to the Time-Cost-Quality Trade-off Problem in Construction Projects Based on Immune Genetic Particle Swarm Optimization83 cited
  • 1990Probabilistic Simulation Studies for Repetitive Construction Processes72 cited
  • 2011Ant Colony Optimization for Multimode Resource-Constrained Project Scheduling53 cited
  • 2003HKCONSIM : A Practical Simulation Solution to Planning Concrete Plant Operations in Hong Kong51 cited
  • 2006MACROS: Multiobjective Automated Construction Resource Optimization System49 cited
  • 2014Opposition-Based Multiple-Objective Differential Evolution to Solve the Time–Cost–Environment Impact Trade-Off Problem in Construction Projects44 cited
  • 2013Discrete-Event Simulation for Estimating Emissions from Construction Processes33 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work