SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Project Engineering: Computer-Oriented Planning and Operational Decision Making
0 references·8 citing·31 second hop
Project Engineering: Computer-Oriented Planning and Operational Decision Making (1990)Project Engineering: Computer-Oriented Pl…Multi-objective time–cost trade-off optimization for the construction scheduling with Rao algorithms (2023)Multi-objective time–cost tra…Novel Hybrid Method in Time–Cost Trade-Off for Resource-Constrained Construction Projects (2020)Novel Hybrid Method in Time–C…AN INTEGRATED MULTI-OBJECTIVE OPTIMIZATION MODEL FOR SOLVING THE CONSTRUCTION TIME-COST TRADE-OFF PROBLEM (2015)AN INTEGRATED MULTI-OBJECTIVE…Shuffled Frog-Leaping Model for Solving Time-Cost-Resource Optimization Problems in Construction Project Planning (2013)Shuffled Frog-Leaping Model f…Optimized acceleration of repetitive construction projects (2013)Optimized acceleration of rep…Fuzzy Enabled Hybrid Genetic Algorithm–Particle Swarm Optimization Approach to Solve TCRO Problems in Construction Project Planning (2011)Fuzzy Enabled Hybrid Genetic …Creating Agile Business Systems with Reusable Knowledge (2007)Creating Agile Business Syste…A Design Process Model to Support Concurrent Project Development in Networks of SMEs (1999)A Design Process Model to Sup…Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Multi‐Criteria Optimization (2014)Survey of quantitative methods in construction (2017)Solving large-scale discrete time–cost trade-off problem using hybrid multi-verse optimizer model (2023)Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)Network analysis algorithm for the solution of discrete time-cost trade-off problem (2016)Gas and oil project time-cost-quality tradeoff: Integrated stochastic and fuzzy multi-objective optimization applying a memetic, nondominated, sorting algorithm (2017)A qualitative framework for selection of optimization algorithm for multi-objective trade-off problem in construction projects (2019)Ant colony optimization for resource-constrained project scheduling (2002)Scheduling Policies for the Stochastic Resource Leveling Problem (2014)Dynamic resource levelling in projects under uncertainty (2020)The multi resource leveling and materials procurement problem: an integrated approach (2020)Scheduling Projects with Repeating Activities (1998)GA-Based Multicriteria Optimal Model for Construction Scheduling (1999)Minimizing duration and crew work interruptions of repetitive construction projects (2018)A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic (2019)Linear Optimization Model to Minimize Total Cost of Repetitive Construction Projects and Identify Order of Units (2021)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Project management in construction (2007)Optimizing time and cost simultaneously in projects with multi-verse optimizer (2023)Simulation Modeling and Analysis. (1983)Reengineering the Corporation (1993)Analysis patterns: reusable objects models (1996)Deriving Mutual Benefits from Offshore Outsourcing: The 24-Hour Knowledge Factory Scenario (2007)The Role of Content and Context in Enterprise Repositories (2010)Infrastructures for VE: A Summary of Achievements (1999)An agent-based infrastructure for virtual enterprises using Web-Services standards (2007)Modified dynamic opposite learning assisted TLBO for solving Time-Cost optimization in generalized construction projects (2023)Wolf-Bird Optimizer (WBO): A novel metaheuristic algorithm for Building Information Modeling-based resource tradeoff (2023)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2015AN INTEGRATED MULTI-OBJECTIVE OPTIMIZATION MODEL FOR SOLVING THE CONSTRUCTION TIME-COST TRADE-OFF PROBLEM71 cited
  • 2013Optimized acceleration of repetitive construction projects63 cited
  • 2023Multi-objective time–cost trade-off optimization for the construction scheduling with Rao algorithms54 cited
  • 2013Shuffled Frog-Leaping Model for Solving Time-Cost-Resource Optimization Problems in Construction Project Planning52 cited
  • 2011Fuzzy Enabled Hybrid Genetic Algorithm–Particle Swarm Optimization Approach to Solve TCRO Problems in Construction Project Planning46 cited
  • 2020Novel Hybrid Method in Time–Cost Trade-Off for Resource-Constrained Construction Projects36 cited
  • 2007Creating Agile Business Systems with Reusable Knowledge23 cited
  • 1999A Design Process Model to Support Concurrent Project Development in Networks of SMEs12 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work