SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Generating Robust Partial Order Schedules
6 references·0 citing·26 second hop
Generating Robust Partial Order Schedules (2004)Generating Robust Partial Order SchedulesStability and resource allocation in project planning (2004)Stability and resource alloca…Generating robust schedules through temporal flexibility (2004)Generating robust schedules t…A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes (2000)A polynomial activity inserti…Project scheduling : recent models, algorithms, and applications (1999)Project scheduling : recent m…Benchmark Instances for Project Scheduling Problems (1999)Benchmark Instances for Proje…Scheduling project networks with resource constraints and time windows (1988)Scheduling project networks w…Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)PSPLIB - A project scheduling problem library (1997)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)A linear programming and constraint propagation-based lower bound for the RCPSP (2000)LSSPER: Solving the Resource-Constrained Project Scheduling Problem with Large Neighbourhood Search (2004)Mixed-integer linear programming for resource leveling problems (2012)Risk, Uncertainty and Profit (1921)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)The trade-off between stability and makespan in resource-constrained project scheduling (2005)A tabu search procedure for developing robust predictive project schedules (2007)An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations (2016)Activity networks: Project planning and control by network models (1977)Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem (1995)A branch and bound algorithm for the resource-constrained project scheduling problem (1998)Project Scheduling under Resource Constraints (1995)Project Scheduling under Resource Constraints: Efficient Heuristics for Several Problem Classes (1995)Time slack-based techniques for robust project scheduling subject to resource uncertainty (2010)Multi-mode resource constrained project scheduling under resource disruptions (2016)A classification and review of approaches and methods for modeling uncertainty in projects (2019)A Constraint-Based Method for Project Scheduling with Time Windows (2002)Is Scheduling a Solved Problem? (2005)Robust execution strategies for project scheduling with unreliable resources and stochastic durations (2015)A hybrid setup for a hybrid scenario: combining heuristics for the home health care problem (2005)A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)
this work references cited by second hop

References

  • 1988Scheduling project networks with resource constraints and time windows375 cited
  • 1999Project scheduling : recent models, algorithms, and applications352 cited
  • 2004Stability and resource allocation in project planning145 cited
  • 1999Benchmark Instances for Project Scheduling Problems132 cited
  • 2000A polynomial activity insertion algorithm in a multi-resource schedule with cumulative constraints and multiple modes125 cited
  • 2004Generating robust schedules through temporal flexibility90 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work