Event‐Tree Analysis with Imprecise Probabilities
8 references·2 citing·41 second hop
Event‐Tree Analysis with Imprecise Probabilities (2011)Event‐Tree Analysis with Imprecise Probab…Bounding Uncertainty in Civil Engineering (2010)Bounding Uncertainty in Civil…Guidelines for tunnelling risk management: International Tunnelling Association, Working Group No. 2 (2004)Guidelines for tunnelling ris…Constructing Probability Boxes and Dempster-Shafer Structures (2003)Constructing Probability Boxe…A fuzzy set approach for event tree analysis (2001)A fuzzy set approach for even…On Default Correlation (2000)On Default CorrelationEvent-tree analysis by fuzzy probability (1991)Event-tree analysis by fuzzy …Decision, risk and reliability (1984)Decision, risk and reliabilityFuzzy sets (1965)Fuzzy setsMethodologies for Assessing Risks of Accidents in Chemical Process Industries (2019)Methodologies for Assessing R…Assessing railway accident risk through event tree analysis (2019)Assessing railway accident ri…Judgment Under Uncertainty: Heuristics and Biases. (1984)On ordered weighted averaging aggregation operators in multicriteria decisionmaking (1988)Fuzzy sets (1996)Proceedings of the 2002 Winter Simulation Conference (2002)Solving elliptic boundary value problems with uncertain coefficients by the finite element method: the stochastic formulation (2004)Risks and decisions for conservation and environmental management (2005)Probability, statistics, and decision for civil engineers (1970)Probability Concepts in Engineering Planning and Design (1975)Quantitative risk evaluation based on event tree analysis technique: Application to the design of shield TBM (2008)Risk Management in Construction Projects (2012)Fuzzy comprehensive Bayesian network-based safety risk assessment for metro construction projects (2017)Decisionmaking in the Presence of Fuzzy Variables (1976)Rating and ranking of multiple-aspect alternatives using fuzzy sets (1977)Fault-Tree Analysis by Fuzzy Probability (1983)Handling data uncertainties in event tree analysis (2009)Fault tree analysis combined with quantitative analysis for high-speed railway accidents (2015)Application of risk analysis in the liquefied natural gas (LNG) sector: An overview (2019)Handbook of human-reliability analysis with emphasis on nuclear power plant applications. Final report (1983)Risk Assessment Methodology for Underground Construction Projects (2004)Risk assessment model selection in construction industry (2010)Applications of fuzzy faulty tree analysis and expert elicitation for evaluation of risks in LPG refuelling station (2014)On the Pricing of Corporate Debt: The Risk Structure of Interest Rates (1974)ON THE PRICING OF CORPORATE DEBT: THE RISK STRUCTURE OF INTEREST RATES* (1974)An Introduction to Copulas (1999)Credit Risk: Modeling, Valuation and Hedging (2004)Copula Modeling: An Introduction for Practitioners (2007)Quantitative Risk Management (2011)Qualitative Research in Business and Management (2020)A fuzzy-HAZOP/ant colony system methodology to identify combined fire, explosion, and toxic release risk in the process industries (2021)A fuzzy logic-based risk evaluation and precaution level estimation of explosive, flammable, and toxic chemicals for preventing damages (2024)Fault and Event Tree Analyses for Process Systems Risk Analysis: Uncertainty Handling Formulations (2010)Risk Assessment: Theory, Methods, and Applications (2011)Impacts of Disasters and Disaster Risk Management in Malaysia: The Case of Floods (2014)Conventional Event Tree Analysis on Emergency Release of Liquefied Natural Gas (2022)Probability Bounds Analysis Applied to the Sandia Verification and Validation Challenge Problem (2015)Family resemblances: Studies in the internal structure of categories (1975)Basic objects in natural categories (1976)Soft set theory—First results (1999)Safety index calculation using intervening variables for structural reliability analysis (1996)Probabilistic strength analysis of rectangular FRP plates using Monte Carlo simulation (2000)Probabilistic finite element analysis using ANSYS (2005)
this work references cited by second hop

References

  • 1965Fuzzy sets67,827 cited
  • 2000On Default Correlation1,257 cited
  • 2003Constructing Probability Boxes and Dempster-Shafer Structures745 cited
  • 2004Guidelines for tunnelling risk management: International Tunnelling Association, Working Group No. 2299 cited
  • 2001A fuzzy set approach for event tree analysis176 cited
  • 1984Decision, risk and reliability154 cited
  • 1991Event-tree analysis by fuzzy probability135 cited
  • 2010Bounding Uncertainty in Civil Engineering27 cited

Cited by

  • 2019Methodologies for Assessing Risks of Accidents in Chemical Process Industries25 cited
  • 2019Assessing railway accident risk through event tree analysis12 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work