SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
1978 transactions of the American Association of Cost Engineers
0 references·12 citing·50 second hop
1978 transactions of the American Association of Cost Engineers (1978)1978 transactions of the American Associa…Finance‐based CPM/LOB scheduling of projects with repetitive non‐serial activities (2009)Finance‐based CPM/LOB schedul…MRO inventory reduction—challenges and management: a case study of the Tennessee Valley Authority (2007)MRO inventory reduction—chall…Towards a knowledge-based assessment of conceptual cost estimates (2004)Towards a knowledge-based ass…Probability distributions of facilities management costs for whole life cycle costing in acute care NHS hospital buildings (2002)Probability distributions of …Antecedents and consequences of market orientation in chartered surveying firms (2002)Antecedents and consequences …Productivity rates and construction methods for high rise concrete construction: a comparative evaluation of UK, German and French contractors (1999)Productivity rates and constr…Construction resource/method factors influencing productivity for high rise concrete construction (1999)Construction resource/method …A Survey of Tendering Practices in the Australian Construction Industry (1998)A Survey of Tendering Practic…Total project cost: a simplified model for decision makers (1996)Total project cost: a simplif…Effective construction planning (1994)Effective construction planni…An agenda for cost modelling research (1991)An agenda for cost modelling …Competence and timing dilemma in construction planning (1988)Competence and timing dilemma…A Paradigm for Developing Better Measures of Marketing Constructs (1979)The Effect of a Market Orientation on Business Profitability (1990)Mail and internet surveys : the tailored design method (2007)Determinants of new product performance in small firms (2009)Antecedents, environmental moderators and consequences of market orientation: A study of pharmaceutical firms in Ghana (2010)Market Orientation, Alliance Orientation, and Business Performance in the Biotechnology Industry (2014)Probabilistic Estimating: Mathematics and Applications (1983)RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS. (1985)Risks, Classification of Estimates, and Contingency Management (1990)Private sector participation in infrastructure projects: a methodology to analyse viability of BOT (1999)Enhancing life cycle cost analysis with a novel cost classification framework for pavement rehabilitation projects (2016)BALANCING PUBLIC AND PRIVATE INTERESTS THROUGH OPTIMIZATION OF CONCESSION AGREEMENT DESIGN FOR USER-PAY PPP PROJECTS (2018)The Structure of Scientific Revolutions (1963)The Structure of Scientific Revolutions. (1964)On the emergence of roles in construction: the qualculative role of project management (2009)Modern Construction Management (2012)Journal of Construction Engineering and Management (1983)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Project Scheduling with Multiple Modes: A Genetic Algorithm (2001)Multiobjective evolutionary finance-based scheduling: Individual projects within a portfolio (2011)Time-cost tradeoff analysis with minimized project financing cost (2018)Finance-based scheduling multi-objective optimization: Benchmarking of evolutionary algorithms (2020)Questionnaire Survey on Bidding in Construction (1988)Factors affecting a contractor's mark-up size decision in Saudi Arabia (1992)Factors considered in tendering decisions by top UK contractors (1993)The Accuracy of Hybrid Estimating Approaches: A Case Study of an Australian State Road & Traffic Authority (2010)The management and control of quality (1989)The Practice of Social Research (1989)Research methods in the social sciences (2005)Addressing Uncertainty in Estimating the Cost for a Product-Service-System Delivering Availability: Epistemology and Ontology (2015)Factors affecting the accuracy of cost estimate during various design stages (2019)Performance Analysis of Construction Cost Prediction Using Neural Network for Multioutput Regression (2022)Characteristics of Organizational Environments and Perceived Environmental Uncertainty (1972)The Nature of Managerial Work (1974)The Structure of "Unstructured" Decision Processes (1976)Process of Planning during Construction (1994)The planning and control process of refurbishment projects (1997)Planning and control processes and techniques for refurbishment management (1998)Top Management Planning (1969)MULTI-OBJECTIVE ASSESSMENT OF EFFECTIVENESS OF STRATEGIC PLANNING: A DISCRIMINANT ANALYSIS APPROACH. (1986)Is construction project planning really doing its job? A critical examination of focus, role and process (1987)Optimal Allocation of Construction Planning Resources (1999)The involvement of the key participants in the production of project plans and the planning performance of refurbishment projects (2010)A concept of corporate planning (1970)Research of factors influencing construction productivity (1990)Factor Model of Construction Productivity (1987)Factors influencing U.K. construction clients' choice of contractor (1994)Evaluation of construction methods and performance for high rise public housing construction in Hong Kong (2002)The performance of contractors in Japan, the UK and the USA: a comparative evaluation of construction cost (2002)Supervised vs. unsupervised learning for construction crew productivity prediction (2011)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2002Antecedents and consequences of market orientation in chartered surveying firms53 cited
  • 2009Finance‐based CPM/LOB scheduling of projects with repetitive non‐serial activities50 cited
  • 1994Effective construction planning48 cited
  • 1988Competence and timing dilemma in construction planning46 cited
  • 1999Productivity rates and construction methods for high rise concrete construction: a comparative evaluation of UK, German and French contractors45 cited
  • 2004Towards a knowledge-based assessment of conceptual cost estimates40 cited
  • 1991An agenda for cost modelling research39 cited
  • 1996Total project cost: a simplified model for decision makers38 cited
  • 1998A Survey of Tendering Practices in the Australian Construction Industry35 cited
  • 1999Construction resource/method factors influencing productivity for high rise concrete construction34 cited
  • 2002Probability distributions of facilities management costs for whole life cycle costing in acute care NHS hospital buildings28 cited
  • 2007MRO inventory reduction—challenges and management: a case study of the Tennessee Valley Authority23 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work