On the morphological structure of a network
11 references·0 citing·32 second hop
On the morphological structure of a network (2004)On the morphological structure of a netwo…RanGen: A Random Network Generator for Activity-on-the-Node Networks (2003)RanGen: A Random Network Gene…The risk of delay of a project in terms of the morphology of its network (1999)The risk of delay of a projec…Phase Transitions in Project Scheduling (1999)Phase Transitions in Project …Advanced Models for Project Management (1999)Advanced Models for Project M…PSPLIB - A project scheduling problem library (1997)PSPLIB - A project scheduling…New Benchmark Results for the Resource-Constrained Project Scheduling Problem (1997)New Benchmark Results for the…Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Characterization and Generati…A Random Activity Network Generator (1993)A Random Activity Network Gen…On the measurement of complexity in activity networks (1980)On the measurement of complex…Heuristic Scheduling of Activities under Resource and Precedence Restrictions (1976)Heuristic Scheduling of Activ…Coefficient of Network Complexity (1974)Coefficient of Network Comple…Resource-constrained project scheduling: A survey of recent developments (1998)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)A hybrid scatter search/electromagnetism meta-heuristic for project scheduling (2004)Project scheduling under uncertainty: Survey and research potentials (2004)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)A Heuristic Model for Scheduling Large Projects with Limited Resources (1967)Analytical Effectiveness of Mathematical Models for R&D Project Selection (1973)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Letter to the Editor—The PERT Model for the Distribution of an Activity Time (1962)Network analysis for planning and scheduling (1970)Activity networks: Project planning and control by network models (1977)A random generator of resource-constrained multi-project network problems (2009)Robust Project Scheduling (2009)A project scheduling approach to production planning with feeding precedence relations (2010)Distribution of the Time Through a Directed, Acyclic Network (1965)A Statistical Theory for PERT Critical Path Analysis (1966)Complexity of service value networks: Conceptualization and empirical investigation (2008)Using a Delphi process and the Analytic Hierarchy Process (AHP) to evaluate the complexity of projects (2010)An Algorithm for Optimal Project Scheduling under Multiple Resource Constraints (1971)Theory of Measurement (1971)Heuristics for Scheduling Resource-Constrained Projects: An Experimental Investigation (1976)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)Project scheduling with resource constraints: A branch and bound approach (1987)An integrated survey of deterministic project scheduling (2001)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)The impact of various activity assumptions on the lead time and resource utilization of resource-constrained projects (2007)A scatter search heuristic for maximising the net present value of a resource-constrained project with fixed activity cash flows (2009)A competitive genetic algorithm for resource-constrained project scheduling (1998)
this work references cited by second hop

References

  • 1997PSPLIB - A project scheduling problem library1,309 cited
  • 1995Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems636 cited
  • 2003RanGen: A Random Network Generator for Activity-on-the-Node Networks306 cited
  • 1997New Benchmark Results for the Resource-Constrained Project Scheduling Problem258 cited
  • 1980On the measurement of complexity in activity networks73 cited
  • 1999The risk of delay of a project in terms of the morphology of its network67 cited
  • 1999Phase Transitions in Project Scheduling66 cited
  • 1993A Random Activity Network Generator63 cited
  • 1974Coefficient of Network Complexity62 cited
  • 1976Heuristic Scheduling of Activities under Resource and Precedence Restrictions55 cited
  • 1999Advanced Models for Project Management44 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work