SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Fencing a Bar Chart
0 references·3 citing·11 second hop
Fencing a Bar Chart (1981)Fencing a Bar ChartA chronographic method for construction project planning (2006)A chronographic method for co…Decision Support for Project Management using A Chronographic Approach (2002)Decision Support for Project …Linear scheduling model: the development of a linear scheduling model with micro computer applications for highway construction project control (1995)Linear scheduling model: the …Application of a Technique for Research and Development Program Evaluation (1959)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Journal of Construction Engineering and Management (1983)Continuous Precedence Relations for Better Modelling Overlapping Activities (2015)Critical path methods in construction practice (1970)A model-based method for organizing tasks in product development (1994)Dynamic Planning and Control Methodology for Design/Build Fast-Track Construction Projects (2001)The analysis of information flow interdependencies within projects (2020)Professional Construction Management (1976)Learning Curve Models of Construction Productivity (1986)RPM: Repetitive Project Modeling (1990)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2002Decision Support for Project Management using A Chronographic Approach30 cited
  • 2006A chronographic method for construction project planning29 cited
  • 1995Linear scheduling model: the development of a linear scheduling model with micro computer applications for highway construction project control29 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work