Satisfiability tests and time‐bound adjustmentsfor cumulative scheduling problems
6 references·15 citing·38 second hop
Satisfiability tests and time‐bound adjustmentsfor cumulative scheduling problems (1999)Satisfiability tests and time‐bound adjus…A branch and bound algorithm for the resource-constrained project scheduling problem (1998)A branch and bound algorithm …New Benchmark Results for the Resource-Constrained Project Scheduling Problem (1997)New Benchmark Results for the…Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Characterization and Generati…A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)A Branch-and-Bound Procedure …HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS (1989)HEURISTIC ALGORITHMS FOR RESO…A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)A Comparison of Exact Approac…Priority-based heuristics for the multi-skill resource constrained project scheduling problem (2016)Priority-based heuristics for…User recommendations for the optimized execution of business processes (2013)User recommendations for the …Branch-and-price approach for the multi-skill project scheduling problem (2013)Branch-and-price approach for…Lower bounds for a multi-skill project scheduling problem (2012)Lower bounds for a multi-skil…Robust Project Scheduling (2009)Robust Project SchedulingCut generation for an integrated employee timetabling and production scheduling problem (2009)Cut generation for an integra…Modeling the supply chain configuration problem with resource constraints (2007)Modeling the supply chain con…Methods to solve multi-skill project scheduling problem (2007)Methods to solve multi-skill …Computing redundant resources for the resource constrained project scheduling problem (2006)Computing redundant resources…Lower Bounds for the Multi-skill Project Scheduling Problem with Hierarchical Levels of Skills (2005)Lower Bounds for the Multi-sk…On linear lower bounds for the resource constrained project scheduling problem (2003)On linear lower bounds for th…Project Scheduling with Time Windows (2002)Project Scheduling with Time …Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling (2001)Truncated branch-and-bound, s…A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints (2000)A Time-Oriented Branch-and-Bo…A Survey of Interval Capacity Consistency Tests for Time- and Resource-Constrained Scheduling (1999)A Survey of Interval Capacity…PSPLIB - A project scheduling problem library (1997)An Exact Algorithm for the Resource-Constrained Project Scheduling Problem Based on a New Mathematical Formulation (1998)The State of the Art of Nurse Rostering (2004)Work assignment to and qualification of multi-skilled human resources under knowledge depreciation and company skill level targets (2009)Multi-skilling in scheduling problems: A review on models, methods and applications (2020)Activity networks: Project planning and control by network models (1977)Resource-constrained project scheduling: A survey of recent developments (1998)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Lower bounds for resource-constrained project scheduling problems (2003)Robust optimization models for project scheduling with resource availability cost (2006)Project scheduling with resource constraints: A branch and bound approach (1987)Project scheduling with flexible resources: formulation and inequalities (2010)Comparison of mixed integer linear programming models for the resource-constrained project scheduling problem with consumption and production of resources (2012)Application of a Technique for Research and Development Program Evaluation (1959)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)A survey on the resource-constrained project scheduling problem (1995)Efficient priority rules for the resource‐constrained project scheduling problem (1996)Robust and reactive project scheduling: a review and classification of procedures (2004)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)A bi-objective model for robust resource-constrained project scheduling (2004)A random key based genetic algorithm for the resource constrained project scheduling problem (2007)Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities (2007)Project Scheduling: A Research Handbook (2002)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A new algorithm for resource-constrained project scheduling with breadth and depth of skills (2020)A decomposition-based multi-objective genetic programming hyper-heuristic approach for the multi-skill resource constrained project scheduling problem (2021)Critical-path planning and scheduling (1959)Resource-constrained project scheduling by simulated annealing (1996)A genetic algorithm approach to a general category project scheduling problem (1999)A Competitive Heuristic Solution Technique for Resource-Constrained Project Scheduling (2001)A competitive genetic algorithm for resource-constrained project scheduling (1998)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)A Robust Genetic Algorithm for Resource Allocation in Project Scheduling (2001)A hybrid scatter search/electromagnetism meta-heuristic for project scheduling (2004)Justification and RCPSP: A technique that pays (2004)
this work references cited by second hop

References

  • 1995Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems636 cited
  • 1992A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem606 cited
  • 1984A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem341 cited
  • 1998A branch and bound algorithm for the resource-constrained project scheduling problem323 cited
  • 1997New Benchmark Results for the Resource-Constrained Project Scheduling Problem258 cited
  • 1989HEURISTIC ALGORITHMS FOR RESOURCE-CONSTRAINED PROJECT SCHEDULING: A REVIEW AND AN EMPIRICAL ANALYSIS195 cited

Cited by

  • 2000A Time-Oriented Branch-and-Bound Algorithm for Resource-Constrained Project Scheduling with Generalised Precedence Constraints116 cited
  • 2005Lower Bounds for the Multi-skill Project Scheduling Problem with Hierarchical Levels of Skills115 cited
  • 2016Priority-based heuristics for the multi-skill resource constrained project scheduling problem90 cited
  • 2003On linear lower bounds for the resource constrained project scheduling problem71 cited
  • 2001Truncated branch-and-bound, schedule-construction, and schedule-improvement procedures for resource-constrained project scheduling70 cited
  • 2009Robust Project Scheduling63 cited
  • 2013Branch-and-price approach for the multi-skill project scheduling problem

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

61 cited
  • 2013User recommendations for the optimized execution of business processes56 cited
  • 2007Modeling the supply chain configuration problem with resource constraints55 cited
  • 2002Project Scheduling with Time Windows51 cited
  • 2006Computing redundant resources for the resource constrained project scheduling problem48 cited
  • 2009Cut generation for an integrated employee timetabling and production scheduling problem48 cited
  • 2007Methods to solve multi-skill project scheduling problem44 cited
  • 2012Lower bounds for a multi-skill project scheduling problem42 cited
  • 1999A Survey of Interval Capacity Consistency Tests for Time- and Resource-Constrained Scheduling42 cited