SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Decision and risk analysis for construction management
0 references·2 citing·4 second hop
Decision and risk analysis for construction management (1983)Decision and risk analysis for constructi…Risk-Based Prioritization of Construction Inspection (2018)Risk-Based Prioritization of …Fuzzy Logic Model for Determining Minimum Bid Markup (2007)Fuzzy Logic Model for Determi…Bidding Strategies and Probabilities (1967)Regularization Neural Network for Construction Cost Estimation (1998)A proposal for construction project risk assessment using fuzzy logic (2000)Risk and risk management in construction: a review and future directions for research (1998)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2018Risk-Based Prioritization of Construction Inspection32 cited
  • 2007Fuzzy Logic Model for Determining Minimum Bid Markup32 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work