SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
THE METHOD FOR IMPROVING STABILITY OF CONSTRUCTION PROJECT SCHEDULES THROUGH BUFFER ALLOCATION / STATYBOS VYKDYMO GRAFIKO STABILUMO UŽTIKRINIMAS PASKIRSTANT LAIKO REZERVUS
16 references·0 citing·46 second hop
THE METHOD FOR IMPROVING STABILITY OF CONSTRUCTION PROJECT SCHEDULES THROUGH BUFFER ALLOCATION / STATYBOS VYKDYMO GRAFIKO STABILUMO UŽTIKRINIMAS PASKIRSTANT LAIKO REZERVUS (2011)THE METHOD FOR IMPROVING STABILITY OF CON…Risk assessment of construction projects (2010)Risk assessment of constructi…RISK MANAGEMENT IN ROAD CONSTRUCTION: THE CASE OF SRI LANKA (2009)RISK MANAGEMENT IN ROAD CONST…FACTORS AFFECTING THE PERFORMANCE OF CONSTRUCTION PROJECTS IN THE GAZA STRIP (2009)FACTORS AFFECTING THE PERFORM…STRATEGIES FOR AVOIDING ASYMMETRIC INFORMATION IN CONSTRUCTION PROJECT MANAGEMENT (2008)STRATEGIES FOR AVOIDING ASYMM…Resource-constrained construction project scheduling model for profit maximization considering cash flow (2008)Resource-constrained construc…MULTI‐ATTRIBUTE ANALYSIS OF INVESTMENTS RISK ALTERNATIVES IN CONSTRUCTION / STATYBOS ALTERNATYVŲ INVESTICINĖS RIZIKOS DAUGIATIKSLĖ ANALIZĖ TAIKANT SAW IR CLARA METODUS (2008)MULTI‐ATTRIBUTE ANALYSIS OF I…EXPERIENCE OF THE GAME THEORY APPLICATION IN CONSTRUCTION MANAGEMENT / LOŠIMŲ TEORIJOS TAIKYMO PATIRTIS STATYBOS VADYBOJE (2008)EXPERIENCE OF THE GAME THEORY…Proactive heuristic procedures for robust project scheduling: An experimental analysis (2007)Proactive heuristic procedure…Scheduling Construction Projects Using Evolutionary Algorithm (2006)Scheduling Construction Proje…The trade-off between stability and makespan in resource-constrained project scheduling (2005)The trade-off between stabili…The use of buffers in project management: The trade-off between stability and makespan (2004)The use of buffers in project…Reliability Buffering for Construction Projects (2004)Reliability Buffering for Con…A bi-objective model for robust resource-constrained project scheduling (2004)A bi-objective model for robu…The construction of stable project baseline schedules (2003)The construction of stable pr…Use of fuzzy numbers in project risk (criticality) assessment (2001)Use of fuzzy numbers in proje…On the optimal management of project risk (1998)On the optimal management of …Critical-Path Planning and Scheduling: Mathematical Basis (1961)Fuzzy sets (1965)Fuzzy sets (1996)A heuristic method for RCPSP with fuzzy activity times (2010)Two Schools of Risk Analysis: A Review of past Research on Project Risk (2011)Modeling project criticality in IT project portfolios (2018)PSPLIB - A project scheduling problem library (1997)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Project scheduling under uncertainty: Survey and research potentials (2004)Robust scheduling and robustness measures for the discrete time/cost trade-off problem (2010)A purely proactive scheduling procedure for the resource-constrained project scheduling problem with stochastic activity durations (2015)An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations (2016)Activity networks: Project planning and control by network models (1977)Project Scheduling: A Research Handbook (2002)Project Scheduling—Theory and Practice (2005)A two-stage-priority-rule-based algorithm for robust resource-constrained project scheduling (2007)Proactive and reactive strategies for resource-constrained project scheduling with uncertain resource availabilities (2007)Multiple Attribute Decision Making (1981)Multiple Attribute Decision Making: Methods and Applications (1981)Compromise solution by MCDM methods: A comparative analysis of VIKOR and TOPSIS (2003)Flexible contracts to cope with uncertainty in public–private partnerships (2012)A modified TOPSIS with a different ranking index (2016)A systematic review and meta-Analysis of SWARA and WASPAS methods: Theory and applications with recent fuzzy developments (2017)Principles of accounting (1919)Optimizing project selection and scheduling problems with time-dependent resource constraints (2011)Optimizing linear project scheduling with multi-skilled crews (2012)Overall multiobjective optimization of construction projects scheduling using particle swarm (2016)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)A tabu search procedure for developing robust predictive project schedules (2007)Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study (2003)Factors affecting cost performance: evidence from Indian construction projects (2005)Significant factors causing delay in the UAE construction industry (2006)CAUSES OF DELAYS IN CONSTRUCTION PROJECTS IN TURKEY (2012)Determining Critical Success Factors of Project Management Practice: A Conceptual Framework (2014)Structural Equation Model for Evaluating Factors Affecting Quality of Social Infrastructure Projects (2018)Case Study Research: Design and Methods (1984)Project management : a systems approach to planning, scheduling, and controlling (1995)Case study research: design and methods (2011)Labour productivity in Iranian construction projects (2015)Major construction risk factors considered by general contractors in Qatar (2015)An application of WASPAS method in risk qualitative analysis: a case study of a road construction project in Iran (2019)Project management — A managerial approach (1989)Robust Discrete Optimization and Its Applications (1997)Robust Discrete Optimization and Its Applications. (1998)Stability and resource allocation in project planning (2004)A review of methods, techniques and tools for project planning and control (2018)
this work references cited by second hop

References

  • 2010Risk assessment of construction projects454 cited
  • 2009FACTORS AFFECTING THE PERFORMANCE OF CONSTRUCTION PROJECTS IN THE GAZA STRIP424 cited
  • 2004A bi-objective model for robust resource-constrained project scheduling249 cited
  • 2007Proactive heuristic procedures for robust project scheduling: An experimental analysis244 cited
  • 2004The use of buffers in project management: The trade-off between stability and makespan232 cited
  • 2003The construction of stable project baseline schedules186 cited
  • 2005The trade-off between stability and makespan in resource-constrained project scheduling142 cited
  • 2008Resource-constrained construction project scheduling model for profit maximization considering cash flow123 cited
  • 2009RISK MANAGEMENT IN ROAD CONSTRUCTION: THE CASE OF SRI LANKA116 cited
  • 2001Use of fuzzy numbers in project risk (criticality) assessment103 cited
  • 2008STRATEGIES FOR AVOIDING ASYMMETRIC INFORMATION IN CONSTRUCTION PROJECT MANAGEMENT90 cited
  • 2008MULTI‐ATTRIBUTE ANALYSIS OF INVESTMENTS RISK ALTERNATIVES IN CONSTRUCTION / STATYBOS ALTERNATYVŲ INVESTICINĖS RIZIKOS DAUGIATIKSLĖ ANALIZĖ TAIKANT SAW IR CLARA METODUS87 cited
  • 1998On the optimal management of project risk84 cited
  • 2004Reliability Buffering for Construction Projects74 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

  • 2008EXPERIENCE OF THE GAME THEORY APPLICATION IN CONSTRUCTION MANAGEMENT / LOŠIMŲ TEORIJOS TAIKYMO PATIRTIS STATYBOS VADYBOJE73 cited
  • 2006Scheduling Construction Projects Using Evolutionary Algorithm68 cited
  • Cited by

    No citing works inside the corpus for this window.