SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Construction Accounting and Financial Management
0 references·13 citing·50 second hop
Construction Accounting and Financial Management (2004)Construction Accounting and Financial Man…Big Data with deep learning for benchmarking profitability performance in project tendering (2020)Big Data with deep learning f…A lessons-learned tool for organizational learning in construction (2019)A lessons-learned tool for or…Time-cost tradeoff analysis with minimized project financing cost (2018)Time-cost tradeoff analysis w…Prediction of site overhead costs with the use of artificial neural network based model (2018)Prediction of site overhead c…Optimizing Financing Cost in Construction Projects with Fixed Project Duration (2018)Optimizing Financing Cost in …Financial performance of locally owned construction firms in southwestern Nigeria (2018)Financial performance of loca…Cash flow management techniques practices of local firms in Nigeria (2018)Cash flow management techniqu…Value engineering for canal tail irrigation water problem (2017)Value engineering for canal t…Benefit of Cooperation among Subcontractors in Performing High-Reliable Planning (2017)Benefit of Cooperation among …Financial Analysis of a Construction Company in Saudi Arabia (2015)Financial Analysis of a Const…GA-based multi-objective optimization of finance-based construction project scheduling (2010)GA-based multi-objective opti…Fuzzy multi-objective optimization of finance-based scheduling for construction projects with uncertainties in cost (2009)Fuzzy multi-objective optimiz…EVALUATION OF THE COMPETITIVENESS OF CONSTRUCTION COMPANY OVERHEAD COSTS (2009)EVALUATION OF THE COMPETITIVE…Using Improved Genetic Algorithms to Facilitate Time-Cost Optimization (1997)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)MULTIOBJECTIVE OPTIMIZATION MODEL FOR SCHEDULING OF CONSTRUCTION PROJECTS UNDER EXTREME WEATHER (2016)Finance-based scheduling multi-objective optimization: Benchmarking of evolutionary algorithms (2020)CONTRACTOR SELECTION OF CONSTRUCTION IN A COMPETITIVE ENVIRONMENT (2008)MULTI‐ATTRIBUTE CONTRACTORS RANKING METHOD BY APPLYING ORDERING OF FEASIBLE ALTERNATIVES OF SOLUTIONS IN TERMS OF PREFERABILITY TECHNIQUE / DAUGIATIKSLIS RANGOVŲ PARINKIMO METODAS TAIKANT ĮMANOMŲ SPRENDINIŲ ALTERNATYVŲ RANGAVIMO PRIORITETO POŽIŪRIU BŪDĄ (2008)SELECTION OF THE EFFECTIVE DWELLING HOUSE WALLS BY APPLYING ATTRIBUTES VALUES DETERMINED AT INTERVALS (2008)Fuzzy sets (1965)Multiple Attribute Decision Making: Methods and Applications (1981)Fuzzy sets (1996)Multiobjective evolutionary finance-based scheduling: Individual projects within a portfolio (2011)Impacts of uncertain project duration and asymmetric risk sensitivity information in project management (2015)An improved robust buffer allocation method for the project scheduling problem (2016)Theory of Games and Economic Behavior (1945)17. A Value for n-Person Games (1953)A Cooperative Species: Human Reciprocity and Its Evolution (2011)Development of Approach to Support Construction Stakeholders in Implementation of the Last Planner System (2019)Conceptual Profit Allocation Framework for Construction Joint Ventures: Shapley Value Approach (2021)A Review of the Use of Game Theory in Project Management (2022)Neural Network Model for Parametric Cost Estimation of Highway Projects (1998)Neural Network Modeling of Highway Construction Costs (2005)Application of a PSO-based neural network in analysis of outcomes of construction claims (2007)Modelling Construction Site Cost Index Based on Neural Network Ensembles (2019)Risk Assessment of Additional Works in Railway Construction Investments Using the Bayes Network (2019)Prediction of simulated cost contingency for steel reinforcement in building projects: ANN versus regression-based models (2020)Cash Flows in Networks (1970)Project Management for Construction: Fundamental Concepts for Owners, Engineers, Architects, and Builders (1989)Business failures in the construction industry (2000)Comparing optimization modeling approaches for the multi-mode resource-constrained multi-project scheduling problem (2019)Symbiotic organisms search-optimized deep learning technique for mapping construction cash flow considering complexity of project (2020)Prediction Liquidated Damages via Ensemble Machine Learning Model: Towards Sustainable Highway Construction Projects (2022)Scheduling/Cost Optimization and Neural Dynamics Model for Construction (1997)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Hybrid of genetic algorithm and simulated annealing for multiple project scheduling with multiple resource constraints (2008)A NOVEL R/S FRACTAL ANALYSIS AND WAVELET ENTROPY CHARACTERIZATION APPROACH FOR ROBUST FORECASTING BASED ON SELF-SIMILAR TIME SERIES MODELING (2020)Multiple Objective Social Group Optimization for Time–Cost–Quality–Carbon Dioxide in Generalized Construction Projects (2021)Solving large-scale discrete time–cost trade-off problem using hybrid multi-verse optimizer model (2023)Information systems and organizational learning: The social epistemology of organizational knowledge systems (1995)Knowledge Management and Organizational Learning (2006)Organizational Learning (2012)Contribution to improvement of knowledge management in the construction industry - Stakeholders’ perspective on implementation in the largest construction companies (2022)Factors affecting organizational resilience in megaprojects: a leader–employee perspective (2022)Beyond the ‘iron triangle’: Stakeholder perception of key performance indicators (KPIs) for large-scale public sector development projects (2009)The pathologies of big data (2009)Applied Thematic Analysis (2012)A methodology for strategy-oriented project portfolio selection taking dynamic synergy into considerations (2021)Mapping the knowledge domains of value management: a bibliometric approach (2019)Towards smart and sustainable urban management: A novel value engineering decision-making model for sewer projects (2022)A multi-criteria evaluation and stationary analysis of value management implementation barriers for sustainable residential building projects (2023)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2018Optimizing Financing Cost in Construction Projects with Fixed Project Duration63 cited
  • 2018Prediction of site overhead costs with the use of artificial neural network based model59 cited
  • 2019A lessons-learned tool for organizational learning in construction55 cited
  • 2010GA-based multi-objective optimization of finance-based construction project scheduling51 cited
  • 2018Time-cost tradeoff analysis with minimized project financing cost49 cited
  • 2017Benefit of Cooperation among Subcontractors in Performing High-Reliable Planning41 cited
  • 2009Fuzzy multi-objective optimization of finance-based scheduling for construction projects with uncertainties in cost41 cited
  • 2009EVALUATION OF THE COMPETITIVENESS OF CONSTRUCTION COMPANY OVERHEAD COSTS34 cited
  • 2017Value engineering for canal tail irrigation water problem33 cited
  • 2020Big Data with deep learning for benchmarking profitability performance in project tendering31 cited
  • 2018Cash flow management techniques practices of local firms in Nigeria16 cited
  • 2018Financial performance of locally owned construction firms in southwestern Nigeria16 cited
  • 2015Financial Analysis of a Construction Company in Saudi Arabia15 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work