Choosing Appropriate Contract Methods for Design-Build Projects
10 references·0 citing·31 second hop
Choosing Appropriate Contract Methods for Design-Build Projects (2015)Choosing Appropriate Contract Methods for…Determining the Appropriate Proportion of Owner-Provided Design in Design-Build Contracts: Content Analysis Approach (2011)Determining the Appropriate P…Analysis of Selection Criteria for Design-Builders through the Analysis of Requests for Proposal (2011)Analysis of Selection Criteri…A Synthesis of Best-Value Procurement Practices for Sustainable Design-Build Projects in the Public Sector (2010)A Synthesis of Best-Value Pro…Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods (2009)Empirical Comparison of Desig…Risk allocation in the private provision of public infrastructure (2006)Risk allocation in the privat…Comparing Procurement Methods for Design-Build Projects (2006)Comparing Procurement Methods…Design-Builder Selection for Small Highway Projects (2001)Design-Builder Selection for …Design-Build: Planning Through Development (2000)Design-Build: Planning Throug…Public-Sector Design/Build Evolution and Performance (1999)Public-Sector Design/Build Ev…Comparison of U.S. Project Delivery Systems (1998)Comparison of U.S. Project De…Model for Public Sector Design-Build Project Selection (1998)ELECTORAL RULES AND ELECTORAL COORDINATION (1999)Analysis of Owner’s Design and Construction Quality Management Approaches in Design/Build Projects (2004)Hybrid Prequalification-Based, Innovative Contracting Model Using AHP (2007)Impact of Risk on Design-Build Selection for Highway Design and Construction Projects (2013)Content Analysis: An Introduction to its Methodology. (1984)Content-Analysis Research: An Examination of Applications with Directives for Improving Research Reliability and Objectivity (1991)Using content analysis as a research method to inquire into intellectual capital reporting (2004)Research Methods in Social Sciences. (1977)Mail and internet surveys : the tailored design method (2007)Overcoming resistance to change in engineering and construction: Change management factors for owner organizations (2015)Impact of Team Integration and Group Cohesion on Project Delivery Performance (2016)Two Decades of Performance Comparisons for Design-Build, Construction Manager at Risk, and Design-Bid-Build: Quantitative Analysis of the State of Knowledge on Project Cost, Schedule, and Quality (2017)Data Analysis and Decision Making with Microsoft Excel (1999)Exploring performance of the integrated project delivery process on complex building projects (2016)Content Analysis for the Social Sciences and Humanities. (1970)Exploring the project manager's intention to address sustainability in the project board (2018)Effectiveness of Project Delivery Systems in Executing Green Buildings (2019)Exploring variety in factors that stimulate project managers to address sustainability issues (2020)Environmental factors and work performance of project managers in the construction industry (2005)Identification of Risk Factors Affecting PPP Waste‐to‐Energy Incineration Projects in China: A Multiple Case Study (2018)Exploring Critical Success Factors for Partnering in Construction Projects (2004)Understanding Construction Industry Experience and Attitudes toward Integrated Project Delivery (2010)Making sense of the multi-party contractual arrangements of project partnering, project alliancing and integrated project delivery (2012)Contractor Selection for Design/Build Projects (2000)Performance Comparison of Large Design-Build and Design-Bid-Build Highway Projects (2011)Preferred risk allocation in China’s public–private partnership (PPP) projects (2009)Developing a risk assessment model for PPP projects in China — A fuzzy synthetic evaluation approach (2010)Risk analysis in fixed-price design–build construction projects (2003)Project Delivery System Selection under Uncertainty: Multicriteria Multilevel Decision Aid Model (2007)Time and Cost Performance of Design–Build Projects (2015)
this work references cited by second hop

References

  • 2006Risk allocation in the private provision of public infrastructure505 cited
  • 1998Comparison of U.S. Project Delivery Systems484 cited
  • 2009Empirical Comparison of Design/Build and Design/Bid/Build Project Delivery Methods284 cited
  • 1999Public-Sector Design/Build Evolution and Performance219 cited
  • 2006Comparing Procurement Methods for Design-Build Projects198 cited
  • 2000Design-Build: Planning Through Development133 cited
  • 2001Design-Builder Selection for Small Highway Projects89 cited
  • 2010A Synthesis of Best-Value Procurement Practices for Sustainable Design-Build Projects in the Public Sector84 cited
  • 2011Determining the Appropriate Proportion of Owner-Provided Design in Design-Build Contracts: Content Analysis Approach47 cited
  • 2011Analysis of Selection Criteria for Design-Builders through the Analysis of Requests for Proposal45 cited

Cited by

No citing works inside the corpus for this window.