Construction Project Scheduling
1 references·16 citing·44 second hop
Construction Project Scheduling (1991)Construction Project SchedulingPrecedence and Arrow Networking Techniques for Construction (1980)Precedence and Arrow Networki…Multi-objective multi-mode resource-constrained project scheduling with fuzzy activity durations in prefabricated building construction (2021)Multi-objective multi-mode re…Incorporating Multiskilling and Learning in the Optimization of Crew Composition (2015)Incorporating Multiskilling a…Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/unconstrained resources (2008)Finding the shortest path wit…Evolutionary resource scheduler for linear projects (2007)Evolutionary resource schedul…A lognormal approximation of activity duration in PERT using two time estimates (2006)A lognormal approximation of …Work Continuity Constraints in Project Scheduling (2005)Work Continuity Constraints i…Evaluation of the Resource-Constrained Critical Path Method Algorithms (2005)Evaluation of the Resource-Co…Setting Maximum Incentive for Incentive/Disincentive Contracts for Highway Projects (2004)Setting Maximum Incentive for…Application of genetic algorithms to construction scheduling with or without resource constraints (2002)Application of genetic algori…Simplified Program Evaluation and Review Technique (PERT) (1999)Simplified Program Evaluation…Optimal Bid Model for Price-Time Biparameter Construction Contracts (1999)Optimal Bid Model for Price-T…Application of artificial neural network to forecast construction duration of buildings at the predesign stage (1999)Application of artificial neu…Project logistics: integrating the procurement and construction processes (1998)Project logistics: integratin…Linear scheduling: past research efforts and future directions (1998)Linear scheduling: past resea…Comparison of Delay Analysis Methodologies (1998)Comparison of Delay Analysis …The applicability of project management software and advanced IT techniques in construction delays mitigation (1997)The applicability of project …Application of a Technique for Research and Development Program Evaluation (1959)An Analytical Study of the PERT Assumptions (1964)Probability, statistics, and decision for civil engineers (1970)Project scheduling and monitoring: current research status (2004)Uncertainty in Task Duration and Cost Estimates: Fusion of Probabilistic Forecasts and Deterministic Scheduling (2012)Schedule risk analysis of infrastructure projects: A hybrid dynamic approach (2018)Construction Resource Scheduling with Genetic Algorithms (1996)Linear Scheduling Model: Development of Controlling Activity Path (1998)Scheduling Projects with Repeating Activities (1998)GA optimization model for repetitive projects with soft logic (2011)Overall multiobjective optimization of construction projects scheduling using particle swarm (2016)Professional Construction Management (1976)Concurrent Delays in Construction Projects (1987)Process Model for Administrating Construction Claims (2002)Construction Delay Analysis Techniques—A Review of Application Issues and Improvement Needs (2013)Causes of delays in construction industry and comparative delay analysis techniques with SCL protocol (2018)A competitive genetic algorithm for resource-constrained project scheduling (1998)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Backward-Forward Hybrid Genetic Algorithm for Resource-Constrained Multiproject Scheduling Problem (2014)Bi-objective multi-mode resource-constrained multi-project scheduling using combined NSGA II and Q-learning algorithm (2023)Incentive/Disincentive Guidelines for Highway Construction Contracts (1995)Time Is Money: Innovative Contracting Methods in Highway Construction (1995)Evaluation of Alternative Contracting Techniques on FDOT Construction Projects (2007)Optimal Incentive Contract with Risk-Neutral Contractor (2012)Incentive Contracts in Serial Stochastic Projects (2015)Scheduling project networks with resource constraints and time windows (1988)Automated trade‐off between time and cost in planning repetitive construction projects (2009)Optimised scheduling for weather sensitive offshore construction projects (2016)Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Resource-constrained project scheduling: A survey of recent developments (1998)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Permutation-Based Elitist Genetic Algorithm for Optimization of Large-Sized Resource-Constrained Project Scheduling (2008)Some Properties of Schedules for Large Projects with Limited Resources (1964)Project Management With Cpm, Pert and Precedence Diagramming (1983)Resource-Activity Critical-Path Method for Construction Planning (2003)Schedule Analysis under the Effect of Resource Allocation (2007)Fuzzy sets (1965)Fuzzy sets (1996)PSPLIB - A project scheduling problem library (1997)Automated construction scheduling using deep reinforcement learning with valid action sampling (2024)Resource leveling in construction by genetic algorithm-based optimization and its decision support system application (2000)Stochastic Construction Time-Cost Trade-Off Analysis (2000)Resource Optimization Using Combined Simulation and Genetic Algorithms (2003)
this work references cited by second hop

References

  • 1980Precedence and Arrow Networking Techniques for Construction167 cited

Cited by

  • 1998Comparison of Delay Analysis Methodologies122 cited
  • 2005Work Continuity Constraints in Project Scheduling105 cited
  • 2007Evolutionary resource scheduler for linear projects91 cited
  • 1999Simplified Program Evaluation and Review Technique (PERT)89 cited
  • 2021Multi-objective multi-mode resource-constrained project scheduling with fuzzy activity durations in prefabricated building construction81 cited
  • 2002Application of genetic algorithms to construction scheduling with or without resource constraints73 cited
  • 2008Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/unconstrained resources65 cited
  • 2004Setting Maximum Incentive for Incentive/Disincentive Contracts for Highway Projects63 cited
  • 2005Evaluation of the Resource-Constrained Critical Path Method Algorithms57 cited
  • 2015Incorporating Multiskilling and Learning in the Optimization of Crew Composition52 cited
  • 1997The applicability of project management software and advanced IT techniques in construction delays mitigation51 cited
  • 1998Project logistics: integrating the procurement and construction processes50 cited
  • 1999Optimal Bid Model for Price-Time Biparameter Construction Contracts

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

45 cited
  • 2006A lognormal approximation of activity duration in PERT using two time estimates44 cited
  • 1999Application of artificial neural network to forecast construction duration of buildings at the predesign stage44 cited
  • 1998Linear scheduling: past research efforts and future directions42 cited