SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Construction Cost Management: Learning from Case Studies
0 references·6 citing·28 second hop
Construction Cost Management: Learning from Case Studies (2008)Construction Cost Management: Learning fr…A hybrid multiple-criteria decision portfolio with the resource constraints model of a smart healthcare management system for public medical centers (2021)A hybrid multiple-criteria de…Theoretical review on critical risk factors in oil and gas construction projects in Yemen (2020)Theoretical review on critica…Data-Driven Simulation Model for Quality-Induced Rework Cost Estimation and Control Using Absorbing Markov Chains (2018)Data-Driven Simulation Model …Inclusion of strategic management theories to project management (2015)Inclusion of strategic manage…A fuzzy model for evaluating risk impacts on variability between contract sum and final account in government-funded construction projects (2015)A fuzzy model for evaluating …Risk Management Practices in a Construction Project - a case study (2011)Risk Management Practices in …A resource‐based view of the firm (1984)Firm Resources and Sustained Competitive Advantage (1991)Firm resources and sustained competitive advantage (2004)Managing portfolio interdependencies (2017)A Correlational Study on Project Management Methodology and Project Success (2019)Ambiguity factors in construction contracts entailing conflicts (2021)World development report 1994 : infrastructure for development (1994)A comparative study of causes of time overruns in Hong Kong construction projects (1997)Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study (2003)A Fuzzy-bayesian Model for Risk Assessment in Power Plant Projects (2016)Modified Fuzzy Group Decision-Making Approach to Cost Overrun Risk Assessment of Power Plant Projects (2018)Toward a cleaner project procurement: Evaluation of construction projects’ vulnerability to corruption in developing countries (2019)The Case for Qualitative Research (1980)Case Study Research: Design and Methods (1984)Case Study: A Strategic Research Methodology (2008)A study for an appropriate risk management of new technology deployment in Nuclear Power Plants (2016)Introduction to Statistical Quality Control (1992)Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects (2002)Introduction to Statistical Quality Control (2007)Causes of delay in large construction projects (2006)Causes and effects of delays in Malaysian construction industry (2007)Understanding the key risks in construction projects in China (2007)Construction Industry from Perspective of Force Majeure and Environmental Risk Compared to the COVID-19 Outbreak: A Systematic Literature Review (2022)Review of studies on risk factors in critical infrastructure projects from 2011 to 2023 (2024)Structural equation modeling and Fuzzy set theory: Advancing risk assessment in oil and gas construction projects (2024)A technology acceptance model for empirically testing new end-user information systems : theory and results (1985)Decision making with dependence and feedback : the analytic network process (1996)Creating Shared Value (2018)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2015A fuzzy model for evaluating risk impacts on variability between contract sum and final account in government-funded construction projects67 cited
  • 2015Inclusion of strategic management theories to project management63 cited
  • 2020Theoretical review on critical risk factors in oil and gas construction projects in Yemen58 cited
  • 2011Risk Management Practices in a Construction Project - a case study47 cited
  • 2021A hybrid multiple-criteria decision portfolio with the resource constraints model of a smart healthcare management system for public medical centers34 cited
  • 2018Data-Driven Simulation Model for Quality-Induced Rework Cost Estimation and Control Using Absorbing Markov Chains28 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work