Critical path methods in construction practice
0 references·16 citing·43 second hop
Critical path methods in construction practice (1970)Critical path methods in construction pra…Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques (2019)Survey Comparing Critical Pat…The moderating effect of project risk mitigation strategies on the relationship between delay factors and construction project performance (2016)The moderating effect of proj…An Advanced Stochastic Time‐Cost Tradeoff Analysis Based on a CPM‐Guided Genetic Algorithm (2015)An Advanced Stochastic Time‐C…Causes of construction cost and time overruns: The 2010 FIFA World Cup stadia in South Africa (2011)Causes of construction cost a…Probabilistic Estimation and Allocation of Project Time Contingency (2010)Probabilistic Estimation and …Efficient Hybrid Genetic Algorithm for Resource Leveling via Activity Splitting (2010)Efficient Hybrid Genetic Algo…Comparison of Linear Scheduling Model and Repetitive Scheduling Method (2003)Comparison of Linear Scheduli…Importance of Capacity Constraints to Construction Cost and Schedule (2000)Importance of Capacity Constr…Resource Leveling of Linear Schedules Using Integer Linear Programming (1998)Resource Leveling of Linear S…Correlation-Induction Techniques for Estimating Quantiles in Simulation Experiments (1998)Correlation-Induction Techniq…A methodology for assessing construction project delays (1998)A methodology for assessing c…Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs (1997)Resource-constrained project …Integrated Variance Reduction Strategies for Simulation (1996)Integrated Variance Reduction…Estimation of project total cost and duration for housing projects in the U.K. (1996)Estimation of project total c…Packing Method for Resource Leveling (Pack) (1990)Packing Method for Resource L…Time‐Cost Trade‐Off Among Related Activities (1989)Time‐Cost Trade‐Off Among Rel…Causes of construction delay: traditional contracts (2002)Megaprojects and Risk (2003)Causes and effects of delays in Malaysian construction industry (2007)Challenges of mega construction projects in developing countries (2013)Causes of Cost Overrun In Construction (2014)An Investigation into Factors Causing Delays in Road Construction Projects in Kenya (2015)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Activity networks: Project planning and control by network models (1977)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Augmented heuristic algorithm for multi-skilled resource scheduling (2011)A hybrid project scheduling and material ordering problem: Modeling and solution algorithms (2017)Resource-constrained time–cost-quality-energy-environment tradeoff problem by considering blockchain technology, risk and robustness: a case study of healthcare project (2022)Project Management With Cpm, Pert and Precedence Diagramming (1983)Resource Leveling in Construction by Optimization (1989)Mixed-integer linear programming for resource leveling problems (2012)Optimizing Multiple-Resources Leveling in Multiple Projects Using Discrete Symbiotic Organisms Search (2015)Planning and analysis of construction operations (1992)Scheduling Projects with Repeating Activities (1998)Work Continuity Constraints in Project Scheduling (2005)Evolutionary resource scheduler for linear projects (2007)LOB and CPM Integrated Method for Scheduling Repetitive Projects (2012)Professional Construction Management (1976)Optimization model for resource assignment problems of linear construction projects (2006)Productivity Scheduling Method: Linear Schedule Analysis with Singularity Functions (2009)Statistical Properties of Construction Duration Data (1992)A Guide to the project management body of knowledge (1996)Small to Medium Contractor Contingency and Assumption of Risk (1999)A Fuzzy-Based Integrated Framework for Assessing Time Contingency in Construction Projects (2015)Schedule Delay Risk Analysis in Construction Projects with a Simulation-Based Expert System (2020)Risk and Uncertainty in the Cost Contingency of Transport Projects: Accommodating Bias or Heuristics, or Both? (2021)Relationship between value and duration of construction projects (1991)Modelling and predicting construction durations in Hong Kong public housing (1999)Developing a benchmark model for project construction time performance in Hong Kong (2003)Conceptual Estimation of Construction Costs Using the Multistep Ahead Approach (2016)Simulation Modeling and Analysis. (1983)Large Sample Properties of Simulations Using Latin Hypercube Sampling (1987)A Comparison of Three Methods for Selecting Values of Input Variables in the Analysis of Output from a Computer Code (2000)Assessing Extension of Time delays on major projects (2002)Construction Delay Analysis Techniques—A Review of Application Issues and Improvement Needs (2013)Delay Causes and Emerging Digital Tools: A Novel Model of Delay Analysis, Including Integrated Project Delivery and PMBOK (2019)Control Variates for Probability and Quantile Estimation (1998)Probabilistic Error Bounds for Simulation Quantile Estimators (2003)Confidence intervals for quantiles when applying variance-reduction techniques (2012)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 1990Packing Method for Resource Leveling (Pack)141 cited
  • 1998Resource Leveling of Linear Schedules Using Integer Linear Programming120 cited
  • 2011Causes of construction cost and time overruns: The 2010 FIFA World Cup stadia in South Africa115 cited
  • 1998A methodology for assessing construction project delays98 cited
  • 1998Correlation-Induction Techniques for Estimating Quantiles in Simulation Experiments90 cited
  • 1996Integrated Variance Reduction Strategies for Simulation86 cited
  • 2003Comparison of Linear Scheduling Model and Repetitive Scheduling Method83 cited
  • 1997Resource-constrained project scheduling with renewable and non-renewable resources and time-resource tradeoffs74 cited
  • 2010Probabilistic Estimation and Allocation of Project Time Contingency71 cited
  • 1996Estimation of project total cost and duration for housing projects in the U.K.71 cited
  • 2019Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques68 cited
  • 2015An Advanced Stochastic Time‐Cost Tradeoff Analysis Based on a CPM‐Guided Genetic Algorithm57 cited
  • 2010Efficient Hybrid Genetic Algorithm for Resource Leveling via Activity Splitting52 cited
  • 1989Time‐Cost Trade‐Off Among Related Activities

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

51 cited
  • 2000Importance of Capacity Constraints to Construction Cost and Schedule49 cited
  • 2016The moderating effect of project risk mitigation strategies on the relationship between delay factors and construction project performance46 cited