SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
A Hybrid Approach to Scheduling with Earliness and Tardiness Costs
1 references·0 citing·6 second hopsampled
A Hybrid Approach to Scheduling with Earliness and Tardiness Costs (2003)A Hybrid Approach to Scheduling with Earl…A Constraint-Based Method for Project Scheduling with Time Windows (2002)A Constraint-Based Method for…Scheduling project networks with resource constraints and time windows (1988)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)The max K-armed bandit: a new model of exploration applied to search heuristic selection (2005)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)Development of a Socially Believable Multi-Robot Solution from Town to Home (2014)
this work references cited by second hop· second hop is a sample of the most-cited connections

References

  • 2002A Constraint-Based Method for Project Scheduling with Time Windows206 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work