SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Achieving better performance through target cost contracts
9 references·1 citing·43 second hop
Achieving better performance through target cost contracts (2010)Achieving better performance through targ…Exploring Critical Success Factors for Partnering in Construction Projects (2004)Exploring Critical Success Fa…Case Study Research (2004)Case Study ResearchAn Introduction to Building Procurement Systems (2003)An Introduction to Building P…Incentive Mechanisms for Project Success (2002)Incentive Mechanisms for Proj…How practitioners set share fractions in target cost contracts (2002)How practitioners set share f…The guaranteed maximum price contract as call option (2001)The guaranteed maximum price …Target cost contracts: an analysis of the interplay between fee, target, share and price (2000)Target cost contracts: an ana…Case Study Research: Design and Methods (1984)Case Study Research: Design a…The Case Study as a Serious Research Strategy (1981)The Case Study as a Serious R…Incentive contract design for projects: The owner׳s perspective (2015)Incentive contract design for…PORTFOLIO SELECTION* (1952)On the Folly of Rewarding A, While Hoping for B. (1975)Measurement of project success (1988)Multi-resource trade-off problem of the project contractors in a cooperative environment: highway construction case study (2017)THE CONSTRUCTION INDUSTRY INSTITUTE (1990)Beardwell, I (ed.) Len, H (ed.) & Claydon, T (ed.) 2004, Human Resource Management: A Contemporary Approach, fourth edition, Pearson Education Limited, Essex. (2006)Motivation toward financial incentive goals on construction projects (2010)Construction Project Risk Management Based on the View of Asymmetric Information (2012)The Discovery of Grounded Theory; Strategies for Qualitative Research (1968)Mixing Qualitative and Quantitative Methods: Triangulation in Action (1979)Qualitative Evaluation Methods (1981)Consensus Development Conference (1984)Illustrative Benchmarking Rework and Rework Costs in Swedish Construction Industry (2002)The potential of working hypotheses for deductive exploratory research (2020)The Pricing of Options and Corporate Liabilities (1973)Theory of Rational Option Pricing (1973)Theory of rational option pricing (2005)Evaluating guaranteed maximum price and target cost contracting strategies in Hong Kong construction industry (2007)Identifying the critical success factors for target cost contracts in the construction industry (2010)The Investment Banking Contract For New Issues Under Asymmetric Information: Delegation And The Incentive Problem (1980)Optimal incentive contracts with multiple agents (1984)RISK AND ITS MANAGEMENT IN CONSTRUCTION PROJECTS. (1985)Incentives in the Chinese Construction Industry (2008)The selection of sharing ratios in target cost contracts (2008)Principal-Agent Model of Risk Allocation in Construction Contracts and Its Critique (2013)Characteristics of partnership success: Partnership attributes, communication behavior, and conflict resolution techniques (1994)Comparison of U.S. Project Delivery Systems (1998)An analysis of success factors and benefits of partnering in construction (2000)Social Network Model of Construction (2008)Success factors: public works and public‐private partnerships (2008)Partnering relationships in construction: A literature review (2010)A framework of sustainable supply chain management: moving toward new theory (2008)Improving Impact Studies of Teachers’ Professional Development: Toward Better Conceptualizations and Measures (2009)Case study research: design and methods (2011)Project Procurement System Selection Model (2000)Application of Delphi method in selection of procurement systems for construction projects (2001)Procurement innovation for a circular economy of construction and demolition waste: Lessons learnt from Suzhou, China (2019)Mixed Methods Research: A Research Paradigm Whose Time Has Come (2004)Qualitative research: Methods in the social sciences (2006)Document Analysis as a Qualitative Research Method (2009)Conceptualizing a two‐stage target‐cost arrangement for competitive cooperation (2010)Collaborative incentive contracts: stimulating competitive behaviour without competition (2014)Risk Assessment Model for Optimal Gain–Pain Share Ratio in Target Cost Contract for Construction Projects (2021)
this work references cited by second hop

References

  • 1984Case Study Research: Design and Methods81,948 cited
  • 2004Case Study Research15,455 cited
  • 1981The Case Study as a Serious Research Strategy749 cited
  • 2004Exploring Critical Success Factors for Partnering in Construction Projects468 cited
  • 2003An Introduction to Building Procurement Systems249 cited
  • 2002Incentive Mechanisms for Project Success146 cited
  • 2002How practitioners set share fractions in target cost contracts91 cited
  • 2000Target cost contracts: an analysis of the interplay between fee, target, share and price49 cited
  • 2001The guaranteed maximum price contract as call option37 cited

Cited by

  • 2015Incentive contract design for projects: The owner׳s perspective32 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work