Empirical Evaluation of Earned Value Management Forecasting Accuracy for Time and Cost
16 references·5 citing·25 second hop
Empirical Evaluation of Earned Value Management Forecasting Accuracy for Time and Cost (2015)Empirical Evaluation of Earned Value Mana…Construction and evaluation framework for a real-life project database (2014)Construction and evaluation f…An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances (2013)An experimental investigation…On the dynamic use of project performance and schedule risk information during projecttracking (2010)On the dynamic use of project…A fuzzy approach for the earned value management (2010)A fuzzy approach for the earn…Prediction of project outcome (2008)Prediction of project outcomeAn evaluation of the adequacy of project network generators with systematically sampled networks (2007)An evaluation of the adequacy…A simulation and evaluation of earned value metrics to forecast the project duration (2006)A simulation and evaluation o…A comparison of different project duration forecasting methods using earned value metrics (2005)A comparison of different pro…A guide to the project management body of knowledge (PMBOK guide) (2004)A guide to the project manage…RanGen: A Random Network Generator for Activity-on-the-Node Networks (2003)RanGen: A Random Network Gene…Earned Value Project Management Method and Extensions (2003)Earned Value Project Manageme…Earned value in project management (2003)Earned value in project manag…A model for effective implementation of Earned Value Management methodology (2003)A model for effective impleme…PSPLIB - A project scheduling problem library (1997)PSPLIB - A project scheduling…Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Characterization and Generati…Heuristics for scheduling projects with resource restrictions and several resource-duration modes (1993)Heuristics for scheduling pro…Explainable machine learning for project management control (2023)Explainable machine learning …Application of neural networks and neuro-fuzzy models in construction scheduling (2023)Application of neural network…A machine learning study to improve the reliability of project cost estimates (2023)A machine learning study to i…Earned Schedule min-max: Two new EVM metrics for monitoring and controlling projects (2019)Earned Schedule min-max: Two …Practical Application and Empirical Evaluation of Reference Class Forecasting for Project Management (2016)Practical Application and Emp…Resource-constrained project scheduling: A survey of recent developments (1998)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)The use of buffers in project management: The trade-off between stability and makespan (2004)A Decomposition-Based Genetic Algorithm for the Resource-Constrained Project-Scheduling Problem (2007)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)Support Vector Machine Regression for project control forecasting (2014)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Multi-mode resource constrained multi-project scheduling and resource portfolio problem (2014)Combining Monte-Carlo and hyper-heuristic methods for the multi-mode resource-constrained multi-project scheduling problem (2016)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)A competitive genetic algorithm for resource-constrained project scheduling (1998)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)Project management: A systems approach to planning, scheduling and controlling (1982)Project management — A managerial approach (1989)A Guide to the project management body of knowledge (1996)Sustainable project management through project control in infrastructure projects (2017)An extension of the EVM analysis for project monitoring: The Cost Control Index and the Schedule Control Index (2010)A review of analytical models, approaches and decision support tools in project monitoring and control (2014)Six decades of project management research: Thematic trends and future opportunities (2016)Project Success: A Cultural Framework (2004)Ant colony optimization for resource-constrained project scheduling (2002)Project scheduling under uncertainty: Survey and research potentials (2004)A Retrospective look at our Evolving Understanding of Project Success (2005)Understanding the key risks in construction projects in China (2007)Exploring the value of project management: Linking Project Management Performance and Project Success (2013)
this work references cited by second hop

References

  • 2004A guide to the project management body of knowledge (PMBOK guide)4,323 cited
  • 1997PSPLIB - A project scheduling problem library1,309 cited
  • 1995Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems636 cited
  • 2003Earned value in project management418 cited
  • 2003Earned Value Project Management Method and Extensions392 cited
  • 2005A comparison of different project duration forecasting methods using earned value metrics343 cited
  • 2003RanGen: A Random Network Generator for Activity-on-the-Node Networks298 cited
  • 2008Prediction of project outcome294 cited
  • 2007An evaluation of the adequacy of project network generators with systematically sampled networks202 cited
  • 2013An experimental investigation of metaheuristics for the multi-mode resource-constrained project scheduling problem on new dataset instances181 cited
  • 2003A model for effective implementation of Earned Value Management methodology178 cited
  • 2006A simulation and evaluation of earned value metrics to forecast the project duration171 cited
  • 1993Heuristics for scheduling projects with resource restrictions and several resource-duration modes156 cited
  • 2010A fuzzy approach for the earned value management144 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

2010
On the dynamic use of project performance and schedule risk information during projecttracking
137 cited
  • 2014Construction and evaluation framework for a real-life project database132 cited
  • Cited by

    • 2023Explainable machine learning for project management control61 cited
    • 2016Practical Application and Empirical Evaluation of Reference Class Forecasting for Project Management58 cited
    • 2019Earned Schedule min-max: Two new EVM metrics for monitoring and controlling projects47 cited
    • 2023Application of neural networks and neuro-fuzzy models in construction scheduling46 cited
    • 2023A machine learning study to improve the reliability of project cost estimates40 cited