SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
A Heuristic Approach for Selecting Highway Investment Alternatives
9 references·5 citing·45 second hop
A Heuristic Approach for Selecting Highway Investment Alternatives (2010)A Heuristic Approach for Selecting Highwa…Highway Project Level Life-Cycle Benefit/Cost Analysis under Certainty, Risk, and Uncertainty: Methodology with Case Study (2009)Highway Project Level Life-Cy…Risk-based Life-cycle Costing of Infrastructure Rehabilitation and Construction Alternatives (2003)Risk-based Life-cycle Costing…Life‐cycle cost optimization of steel structures (2002)Life‐cycle cost optimization …Resource Scheduling Using Neural Dynamics Model of Adeli and Park (2001)Resource Scheduling Using Neu…CONSCOM: An OO Construction Scheduling and Change Management System (1999)CONSCOM: An OO Construction S…Introduction to Stochastic Programming (1998)Introduction to Stochastic Pr…Scheduling/Cost Optimization and Neural Dynamics Model for Construction (1997)Scheduling/Cost Optimization …Mathematical Programming and the Analysis of Capital Budgeting Problems. (1964)Mathematical Programming and …Three Problems in Rationing Capital (1955)Three Problems in Rationing C…Trade-Off Analysis Approach for Multiobjective Transportation Investment Decision Making (2014)Trade-Off Analysis Approach f…Social Welfare Maximization of Multimodal Transportation (2014)Social Welfare Maximization o…Optimal Decision Making of Interdependent Tollway Capital Investments Incorporating Risk and Uncertainty (2013)Optimal Decision Making of In…New Methodology for Transportation Investment Decisions with Consideration of Project Interdependencies (2012)New Methodology for Transport…A Dynamic Route Choice Model Considering Uncertain Capacities (2011)A Dynamic Route Choice Model …Urban transportation networks: Equilibrium analysis with mathematical programming methods (1986)Foundations of Dynamic Traffic Assignment: The Past, the Present and the Future (2001)The Price of Robustness (2004)Discretised route travel time models based on cumulative flows (2012)Robust Optimization Strategy for the Shortest Path Problem under Uncertain Link Travel Cost Distribution (2014)Travel Time Reliability Estimation Model Using Observed Link Flows in a Road Network (2015)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Project scheduling with resource constraints: A branch and bound approach (1987)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)Optimizing Resource Leveling in Construction Projects (2009)HYBRID NEURAL INTELLIGENT SYSTEM TO PREDICT BUSINESS FAILURE IN SMALL-TO-MEDIUM-SIZE ENTERPRISES (2011)DETECTION OF DRIVING FATIGUE BY USING NONCONTACT EMG AND ECG SIGNALS MEASUREMENT SYSTEM (2013)Design Patterns: Elements of Reusable Object-Oriented Software (1994)Analysis patterns: reusable objects models (1996)Regularization Neural Network for Construction Cost Estimation (1998)Modeling Framework and Architecture of Hybrid System Dynamics and Discrete Event Simulation for Construction (2010)Construction project change management in Singapore: Status, importance and impact (2012)Automation in construction scheduling: a review of the literature (2015)Annals of operations research (1989)Introduction to Stochastic Programming (1997)A comprehensive framework for project selection problem under uncertainty and real-world constraints (2011)Introduction to Stochastic Programming (2011)Life-cycle cost analysis system for pavement management at project level (2011)Putting sustainability theory into roadway design practice: Implementation of LCA and LCCA analysis for pavement type selection in real world decision making (2017)Introduction to simulation and SLAM II (1979)Probability Concepts in Engineering Planning and Design: Vol. I-Basic Principles. (1979)Reliability-Based Life-Cycle Management of Highway Bridges (2001)Cost simulation in an item-based project involving construction engineering and management (2010)Project cost risk analysis: A Bayesian networks approach for modeling dependencies between cost items (2014)Fuzzy sets (1965)Life Cycle Costing for Design Professionals (1981)Comparative Analysis of Multi‐Criteria Decision‐Making Methods for Seismic Structural Retrofitting (2009)Fuzzy Monte Carlo Simulation and Risk Assessment in Construction (2009)HYBRID MULTIPLE CRITERIA DECISION MAKING METHODS: A REVIEW OF APPLICATIONS IN ENGINEERING (2016)Ambulance location and relocation models (2003)Stochastic Programming Models (2003)A two-stage stochastic programming framework for transportation planning in disaster response (2004)A Linear Programming Algorithm for Mutual Fund Portfolio Selection (1967)A decision model for interdependent information system project selection (1996)Twenty years of linear programming based portfolio optimization (2013)A review of methods and algorithms for optimizing construction scheduling (2013)A Novel Machine Learning Model for Estimation of Sale Prices of Real Estate Units (2015)Capital Budgeting of Interrelated Projects: Survey and Synthesis (1966)Capital Rationing and Organizational Slack in Capital Budgeting (1985)Accounting innovation beyond the enterprise: Problematizing investment decisions and programming economic growth in the U.K. in the 1960s (1991)
this work references cited by second hop

References

  • 1998Introduction to Stochastic Programming1,664 cited
  • 1955Three Problems in Rationing Capital481 cited
  • 1964Mathematical Programming and the Analysis of Capital Budgeting Problems.406 cited
  • 1997Scheduling/Cost Optimization and Neural Dynamics Model for Construction224 cited
  • 2002Life‐cycle cost optimization of steel structures185 cited
  • 2001Resource Scheduling Using Neural Dynamics Model of Adeli and Park150 cited
  • 1999CONSCOM: An OO Construction Scheduling and Change Management System122 cited
  • 2003Risk-based Life-cycle Costing of Infrastructure Rehabilitation and Construction Alternatives119 cited
  • 2009Highway Project Level Life-Cycle Benefit/Cost Analysis under Certainty, Risk, and Uncertainty: Methodology with Case Study104 cited

Cited by

  • 2011A Dynamic Route Choice Model Considering Uncertain Capacities31 cited
  • 2014Social Welfare Maximization of Multimodal Transportation16 cited
  • 2012New Methodology for Transportation Investment Decisions with Consideration of Project Interdependencies10 cited
  • 2014Trade-Off Analysis Approach for Multiobjective Transportation Investment Decision Making8 cited
  • 2013Optimal Decision Making of Interdependent Tollway Capital Investments Incorporating Risk and Uncertainty8 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work