SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Project Scheduling with Time Windows and Scarce Resources: Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions
0 references·16 citing·46 second hop
Project Scheduling with Time Windows and Scarce Resources: Temporal and Resource-Constrained Project Scheduling with Regular and Nonregular Objective Functions (2012)Project Scheduling with Time Windows and …A branch-and-bound embedded genetic algorithm for resource-constrained project scheduling problem with resource transfer time of aircraft moving assembly line (2020)A branch-and-bound embedded g…Multi-mode resource leveling in projects with mode-dependent generalized precedence relations (2017)Multi-mode resource leveling …An effective genetic algorithm for the resource levelling problem with generalised precedence relations (2017)An effective genetic algorith…Sequencing algorithm with multiple-input genetic operators: Application to disaster resilience (2016)Sequencing algorithm with mul…Multi-mode resource constrained project scheduling under resource disruptions (2016)Multi-mode resource constrain…A flow-based tabu search algorithm for the RCPSP with transfer times (2015)A flow-based tabu search algo…Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting (2014)Multi-mode resource-constrain…A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem (2013)A competitive magnet-based ge…Simulating the dynamic scheduling of project portfolios (2010)Simulating the dynamic schedu…A project scheduling approach to production planning with feeding precedence relations (2010)A project scheduling approach…A double genetic algorithm for the MRCPSP/max (2009)A double genetic algorithm fo…R&D project scheduling when activities may fail (2008)R&D project scheduling when a…Modeling the supply chain configuration problem with resource constraints (2007)Modeling the supply chain con…Proactive-Reactive Project Scheduling Trade-Offs and Procedures (2006)Proactive-Reactive Project Sc…Cooperative subcontracting relationship within a project supply chain: A simulation approach (2006)Cooperative subcontracting re…Stochastic resource-constrained scheduling for repetitive construction projects with uncertain supply of resources and funding (2005)Stochastic resource-constrain…Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Modeling Supply Chain Dynamics: A Multiagent Approach* (1998)Simulation in manufacturing and business: A review (2009)A fuzzy group data envelopment analysis model for high-technology project selection: A case study at NASA (2013)A generic heuristic for multi-project scheduling problems with global and local resource constraints (RCMPSP) (2018)A multi-agent based cooperative approach to decentralized multi-project scheduling and resource allocation (2020)PSPLIB - A project scheduling problem library (1997)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Design and Analysis of Experiments (2007)Multi‐mode resource‐constrained project scheduling using modified variable neighborhood search heuristic (2019)A comprehensive mathematical model for resource-constrained multi-objective project portfolio selection and scheduling considering sustainability and projects splitting (2020)Extensions of the resource-constrained project scheduling problem (2023)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)Supply Chain Management: Design, Coordination and Operation (2003)Modeling the supply chain (2007)Partner selection model for design chain collaboration (2012)Combining or separating forward and reverse logistics (2018)Optimizing supply chain configuration with low carbon emission (2020)A competitive genetic algorithm for resource-constrained project scheduling (1998)Experimental investigation of heuristics for resource-constrained project scheduling: An update (2005)Using a fuzzy clustering chaotic-based differential evolution with serial method to solve resource-constrained project scheduling problems (2013)Teaching–learning-based optimization algorithm for multi-skill resource constrained project scheduling problem (2015)Memetic algorithm for solving resource constrained project scheduling problems (2019)Scheduling project networks with resource constraints and time windows (1988)A solution procedure for preemptive multi-mode project scheduling problem with mode changeability to resumption (2014)An improved fuzzy critical chain approach in order to face uncertainty in project scheduling (2017)A model-based method for organizing tasks in product development (1994)Project scheduling under uncertainty: Survey and research potentials (2004)Innovator resilience potential: A process perspective of individual resilience as influenced by innovation project termination (2012)A Knowledge-Based Evolutionary Multiobjective Approach for Stochastic Extended Resource Investment Project Scheduling Problems (2013)Project Planning with Alternative Technologies in Uncertain Environments (2013)Journal of Industrial Engineering (2017)Project Scheduling with Time Windows and Scarce Resources (2003)RanGen: A Random Network Generator for Activity-on-the-Node Networks (2003)An evaluation of the adequacy of project network generators with systematically sampled networks (2007)A risk management-based evaluation of inventory allocations for make-to-order production (2013)Energy-efficient project scheduling with supplier selection in manufacturing projects (2021)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Ant colony optimization for resource-constrained project scheduling (2002)Fuzzy resource-constrained project scheduling with multiple routes: A heuristic solution (2019)Multi-mode resource constrained project scheduling and contractor selection: Mathematical formulation and metaheuristic algorithms (2019)Urban transportation networks: Equilibrium analysis with mathematical programming methods (1986)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)Trends and gaps in the literature of road network repair and restoration in the context of disaster response operations (2022)Space-Time Repetitive Project Scheduling Considering Location and Congestion (2018)Multi-Objective multi-skill resource-constrained project scheduling problem with skill switches: Model and evolutionary approaches (2021)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2014Multi-mode resource-constrained project scheduling problems with non-preemptive activity splitting96 cited
  • 2013A competitive magnet-based genetic algorithm for solving the resource-constrained project scheduling problem93 cited
  • 2016Multi-mode resource constrained project scheduling under resource disruptions79 cited
  • 2008R&D project scheduling when activities may fail78 cited
  • 2010Simulating the dynamic scheduling of project portfolios66 cited
  • 2015A flow-based tabu search algorithm for the RCPSP with transfer times61 cited
  • 2009A double genetic algorithm for the MRCPSP/max56 cited
  • 2007Modeling the supply chain configuration problem with resource constraints55 cited
  • 2010A project scheduling approach to production planning with feeding precedence relations55 cited
  • 2016Sequencing algorithm with multiple-input genetic operators: Application to disaster resilience55 cited
  • 2017An effective genetic algorithm for the resource levelling problem with generalised precedence relations47 cited
  • 2005Stochastic resource-constrained scheduling for repetitive construction projects with uncertain supply of resources and funding47 cited
  • 2006Proactive-Reactive Project Scheduling Trade-Offs and Procedures38 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

2020
A branch-and-bound embedded genetic algorithm for resource-constrained project scheduling problem with resource transfer time of aircraft moving assembly line
38 cited
  • 2017Multi-mode resource leveling in projects with mode-dependent generalized precedence relations36 cited
  • 2006Cooperative subcontracting relationship within a project supply chain: A simulation approach34 cited