SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Liquidated Damages and Extensions of Time in Construction Contracts
0 references·2 citing·7 second hop
Liquidated Damages and Extensions of Time in Construction Contracts (1992)Liquidated Damages and Extensions of Time…Assessment and enforcement of liquidated damages in construction contracts in Ghana (2007)Assessment and enforcement of…An integrated decision support system for dealing with time extension entitlements (2007)An integrated decision suppor…Causes of Delay in Large Building Construction Projects (1995)Factors influencing construction time and cost overruns on high-rise projects in Indonesia (1997)Causes of delay and cost overruns in construction of groundwater projects in a developing countries; Ghana as a case study (2003)Construction delay analysis techniques (1996)Comparison of Delay Analysis Methodologies (1998)Application of a PSO-based neural network in analysis of outcomes of construction claims (2007)Issues Associated with Extension of Time (EoT) Claim in Malaysian Construction Industry (2013)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2007An integrated decision support system for dealing with time extension entitlements34 cited
  • 2007Assessment and enforcement of liquidated damages in construction contracts in Ghana25 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work