SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Developments in contract price forecasting and bidding techniques
0 references·6 citing·24 second hop
Developments in contract price forecasting and bidding techniques (1990)Developments in contract price forecastin…Improvement in Estimating Durations for Building Projects Using Artificial Neural Network and Sensitivity Analysis (2021)Improvement in Estimating Dur…Bid or no-bid decision factors of indigenous contractors in Nigeria (2017)Bid or no-bid decision factor…Residential Building Projects: Building Cost Indicators and Drivers (2007)Residential Building Projects…The maturing concept of estimating project cost contingency: A review (2006)The maturing concept of estim…Interpersonal communication in cost planning during the building design phase (1996)Interpersonal communication i…Parameter prediction for cash flow forecasting models (1992)Parameter prediction for cash…The effects of construction delays on project delivery in Nigerian construction industry (2002)Cost overruns in road construction—what are their sizes and determinants? (2003)Comparison of construction cost estimating models based on regression analysis, neural networks, and case-based reasoning (2004)On human communication (1966)Reflections on the problem of relevance (1970)Analysis of factors that drive brief development in construction (2005)On using a communication-mapping model for environmental management (CMEM) to improve environmental performance in project development processes (2006)The structure and function of communication in society (2007)Communication and Information Flow in Polish Construction Projects (2020)Data modelling and the application of a neural network approach to the prediction of total construction costs (2002)Influence of Project Type and Procurement Method on Rework Costs in Building Construction Projects (2002)Forecast models for actual construction time and cost (2003)Predicting likelihood of cost overrun in educational projects (2017)Application of Cost-Flow Forecasting Models (1982)An S-curve equation for project control (1989)Quantity Surveying Techniques: New Directions (1990)The World Economic Outlook (1983)Modelling global risk factors affecting construction cost performance (2003)Factors Affecting the Success of a Construction Project (2004)Neural Network Model for Parametric Cost Estimation of Highway Projects (1998)A neural network approach for early cost estimation of structural systems of buildings (2004)Predicting construction cost and schedule success using artificial neural networks ensemble and support vector machines classification models (2011)Assessing the Impact of Construction Risks on Cost Overruns: A Risk Path Simulation–Driven Approach (2022)A prediction-based model to optimize construction programs: Considering time, cost, energy consumption, and CO2 emissions trade-off (2024)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 1996Interpersonal communication in cost planning during the building design phase38 cited
  • 2007Residential Building Projects: Building Cost Indicators and Drivers36 cited
  • 2021Improvement in Estimating Durations for Building Projects Using Artificial Neural Network and Sensitivity Analysis30 cited
  • 2006The maturing concept of estimating project cost contingency: A review29 cited
  • 2017Bid or no-bid decision factors of indigenous contractors in Nigeria28 cited
  • 1992Parameter prediction for cash flow forecasting models28 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work