SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
CPM in construction management
0 references·15 citing·48 second hop
CPM in construction management (1971)CPM in construction managementAssessing Understanding of Planning and Scheduling Theory and Practice on Construction Projects (2015)Assessing Understanding of Pl…Effects of the location-based management system on production rates and productivity (2014)Effects of the location-based…Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling (2013)Challenges and opportunities …Improved ant colony optimization algorithms for determining project critical paths (2010)Improved ant colony optimizat…Critical Path Segments Scheduling Technique (2010)Critical Path Segments Schedu…Cost Optimization Model for the Multiresource Leveling Problem with Allowed Activity Splitting (2010)Cost Optimization Model for t…Empirical Research on the Success of Production Control in Building Construction Projects (2009)Empirical Research on the Suc…Using structural equation modeling to analyze relationships among key causes of delay in construction (2008)Using structural equation mod…Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/unconstrained resources (2008)Finding the shortest path wit…Critical Path Scheduling under Resource Calendar Constraints (2007)Critical Path Scheduling unde…Automated Statistical Analysis in Stochastic Project Scheduling Simulation (2006)Automated Statistical Analysi…Finding multiple possible critical paths using fuzzy PERT (2001)Finding multiple possible cri…Project logistics: integrating the procurement and construction processes (1998)Project logistics: integratin…Nondeterministic Networking Methods (1993)Nondeterministic Networking M…Competence and timing dilemma in construction planning (1988)Competence and timing dilemma…Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Project Management: The Managerial Process (1999)Project management: the managerial process (2010)Resource Leveling in Line-of-Balance Scheduling (2013)Project Scheduling by Integration of Time Cost Trade-off and Constrained Resource Scheduling (2014)A genetic algorithm for the robust resource leveling problem (2015)Business Logistics Management (1973)Principles of inventory and materials management (1982)Production and inventory management (1983)Simultaneous scheduling of multiple construction projects considering supplier selection and material transportation routing (2022)Project management — A managerial approach (1989)A Guide to the project management body of knowledge (1996)Shielding Production: Essential Step in Production Control (1998)Improving workflow and resource usage in construction schedules through location-based management system (LBMS) (2018)Analysis of Activity Networks under Uncertainty (1975)Narrow Reliability Bounds for Structural Systems (1979)Fuzzy Optimal Model for Resource-Constrained Construction Scheduling (1999)Float Consumption Impact on Cost and Schedule in the Construction Industry (2007)A Bayesian-Driven Monte Carlo Approach for Managing Construction Schedule Risks of Infrastructures Under Uncertainty (2022)Probability Concepts in Engineering Planning and Design (1975)Simulation Modeling and Analysis. (1983)Simulation modeling and analysis (1999)Probabilistic Estimation and Allocation of Project Time Contingency (2010)Project Duration Forecasting Using Earned Duration Management with Exponential Smoothing Techniques (2016)Data-Driven Machine Learning Approach to Integrate Field Submittals in Project Scheduling (2020)A competitive genetic algorithm for resource-constrained project scheduling (1998)Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)Backward-Forward Hybrid Genetic Algorithm for Resource-Constrained Multiproject Scheduling Problem (2014)Bi-objective multi-mode resource-constrained multi-project scheduling using combined NSGA II and Q-learning algorithm (2023)Principles and Practice of Structural Equation Modeling (1998)Cutoff criteria for fit indexes in covariance structure analysis: Conventional criteria versus new alternatives (1999)Principles and practice of structural equation modeling, 2nd ed. (2005)Evaluating schedule delay causes for private participating public construction works under the Build-Operate-Transfer model (2009)Investigating the causes of delay in grain bin construction projects: the case of China (2017)An investigation of the relationship between project performance measures and project management practices of construction projects for the construction industry in Nigeria (2020)Fuzzy sets (1965)Fuzzy Mathematical Techniques With Applications (1986)Fuzzy sets (1996)A hybrid multi-stage predictive model for supply chain network collapse recovery analysis: a practical framework for effective supply chain network continuity management (2010)Critical Path Definition Using Multicriteria Decision Making: PROMETHEE Method (2012)Distance measures for Interval Type-2 fuzzy numbers (2014)Project Management in Construction: Software Use and Research Directions (2001)Survey of the Construction Industry Relative to the Use of CPM Scheduling for Construction Projects (2006)Investigating the effect of construction management strategies on project greenhouse gas emissions using interactive simulation (2013)Factory Physics : Foundations of Manufacturing Management (1995)Case Study Research (2004)Last Planner and Critical Chain in Construction Management: Comparative Analysis (2010)If CPM is so bad, why have we been using it so long? (2014)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2008Using structural equation modeling to analyze relationships among key causes of delay in construction92 cited
  • 2001Finding multiple possible critical paths using fuzzy PERT75 cited
  • 2006Automated Statistical Analysis in Stochastic Project Scheduling Simulation74 cited
  • 2008Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/unconstrained resources65 cited
  • 2010Cost Optimization Model for the Multiresource Leveling Problem with Allowed Activity Splitting63 cited
  • 2010Critical Path Segments Scheduling Technique61 cited
  • 1993Nondeterministic Networking Methods59 cited
  • 2014Effects of the location-based management system on production rates and productivity54 cited
  • 2009Empirical Research on the Success of Production Control in Building Construction Projects54 cited
  • 1998Project logistics: integrating the procurement and construction processes50 cited
  • 2013Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling48 cited
  • 1988Competence and timing dilemma in construction planning46 cited
  • 2010Improved ant colony optimization algorithms for determining project critical paths39 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

2007
Critical Path Scheduling under Resource Calendar Constraints
38 cited
  • 2015Assessing Understanding of Planning and Scheduling Theory and Practice on Construction Projects37 cited