SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Construction scheduling, cost optimization, and management : a new model based on neurocomputing and object technologies
0 references·2 citing·8 second hop
Construction scheduling, cost optimization, and management : a new model based on neurocomputing and object technologies (2001)Construction scheduling, cost optimizatio…Freeway Work Zone Traffic Delay and Cost Optimization Model (2003)Freeway Work Zone Traffic Del…Simulation‐Facilitated Model for Assessing Cost Correlations (2002)Simulation‐Facilitated Model …Construction Scheduling, Cost Optimization and Management (2001)Optimal Work Zone Lengths for Four-Lane Highways (2001)Neural network model for rapid forecasting of freeway link travel time (2003)Surrogate‐Based Optimization of Expensive‐to‐Evaluate Objective for Optimal Highway Toll Charges in Transportation Network (2013)Short‐Term Traffic Speed Prediction for an Urban Corridor (2016)Probability, statistics, and decision for civil engineers (1970)Project Management With Cpm, Pert and Precedence Diagramming (1983)STROBOSCOPE: State and Resource Based Simulation of Construction Processes (1996)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2003Freeway Work Zone Traffic Delay and Cost Optimization Model158 cited
  • 2002Simulation‐Facilitated Model for Assessing Cost Correlations25 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work