SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
RCPS with Variable Intensity Activities and Feeding Precedence Constraints
8 references·1 citing·40 second hop
RCPS with Variable Intensity Activities and Feeding Precedence Constraints (2006)RCPS with Variable Intensity Activities a…A branch-and-cut algorithm for scheduling of projects with variable-intensity activities (2005)A branch-and-cut algorithm fo…Linear-programming-based heuristics for project capacity planning (2004)Linear-programming-based heur…A review of the contribution of Operational Research to Project Management (2002)A review of the contribution …Advanced Models for Project Management (1999)Advanced Models for Project M…Resource-constrained multi-project management, a hierarchical decision support system (1998)Resource-constrained multi-pr…Resource-Constrained Scheduling of Projects with Variable-Intensity Activities (1990)Resource-Constrained Scheduli…Project Scheduling with Continuously-Divisible, Doubly Constrained Resources (1981)Project Scheduling with Conti…Project Scheduling with Discrete and Continuous Resources (1979)Project Scheduling with Discr…A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A survey of variants and exte…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Management. Tasks, Responsibilities, Practices. (1975)Book ReviewsThe New Science of Management Decision, SimonHerbert A. rev. ed. (Englewood Cliffs, N.J.: Prentice-Hall, 1977), 175 pp., hardback $10.95, paper $5.95 (1978)A review of the recent contribution of systems thinking to operational research and management science (2009)Pluralism in Project Management: Navigating the Crossroads of Specialization and Fragmentation (2010)PSPLIB - A project scheduling problem library (1997)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Project Scheduling: A Research Handbook (2002)A priority-rule method for project scheduling with work-content constraints (2009)Tactical capacity planning in a real-world ETO industry case: An action research (2015)Project Scheduling under Resource Constraints—Historical Review and Categorization of Procedures (1973)Activity networks: Project planning and control by network models (1977)An Efficient Integer Programming Algorithm with Network Cuts for Solving Resource-Constrained Scheduling Problems (1978)Resource-constrained project scheduling: A survey of recent developments (1998)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Resource-Constrained Project Scheduling with Time-Resource Tradeoffs: The Nonpreemptive Case (1982)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)The resource constrained time/cost tradeoff project scheduling problem with discounted cash flows (1996)Uncertainty Modelling in Software Development Projects (With Case Study) (2001)A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)A survey on the resource-constrained project scheduling problem (1995)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Dynamic order acceptance and capacity planning on a single bottleneck resource (2007)Integrated multi-project planning and scheduling - a multiagent approach (2022)Alternate methods of project scheduling with limited resources (1973)Heuristic approaches to discrete-continuous project scheduling problems to minimize the makespan (2010)Discrete-continuous project scheduling with discounted cash inflows and various payment models—a review of recent results (2011)Project scheduling under uncertainty: Survey and research potentials (2004)Resource-constrained multi-project scheduling: Priority rule performance revisited (2010)A survey of hybrid metaheuristics for the resource-constrained project scheduling problem (2019)An updated survey of variants and extensions of the resource-constrained project scheduling problem (2021)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Multiple Resource–Constrained Scheduling Using Branch and Bound (1978)Competitive Strategy: Techniques for Analyzing Industries and Competitors (1980)A note on the paper “Resource-constrained project scheduling: Notation, classification, models and methods” by Brucker et al. (2001)An integrated survey of deterministic project scheduling (2001)GRASP and path relinking for project scheduling under partially renewable resources (2007)Advanced multicriteria models to promote quality and reputation in public construction e-marketplaces (2012)Quantifying the risk of project delays with a genetic algorithm (2015)New summary measures and datasets for the multi-project scheduling problem (2021)
this work references cited by second hop

References

  • 2005A branch-and-cut algorithm for scheduling of projects with variable-intensity activities117 cited
  • 2002A review of the contribution of Operational Research to Project Management113 cited
  • 1981Project Scheduling with Continuously-Divisible, Doubly Constrained Resources113 cited
  • 1998Resource-constrained multi-project management, a hierarchical decision support system52 cited
  • 2004Linear-programming-based heuristics for project capacity planning51 cited
  • 1990Resource-Constrained Scheduling of Projects with Variable-Intensity Activities49 cited
  • 1999Advanced Models for Project Management44 cited
  • 1979Project Scheduling with Discrete and Continuous Resources38 cited

Cited by

  • 2009A survey of variants and extensions of the resource-constrained project scheduling problem904 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work