SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Simulation of Construction Project Duration
0 references·9 citing·37 second hop
Simulation of Construction Project Duration (1979)Simulation of Construction Project Durati…Particle Swarm Optimization Based Approach for Estimation of Costs and Duration of Construction Projects (2020)Particle Swarm Optimization B…Probabilistic Duration Estimation Model for High-Rise Structural Work (2009)Probabilistic Duration Estima…Impact of soft logic on the probabilistic duration of construction projects (2005)Impact of soft logic on the p…Model for Evaluating Networks under Correlated Uncertainty—NETCOR (2000)Model for Evaluating Networks…Combined Discrete-Event/Continuous Simulation for Project Planning (1997)Combined Discrete-Event/Conti…HSM-Simulation–Based Planning Method for Construction Projects (1995)HSM-Simulation–Based Planning…Planning repetitive construction: Current practice (1993)Planning repetitive construct…State of the art in construction simulation (1992)State of the art in construct…Hybrid Expert System for Construction Planning and Scheduling (1990)Hybrid Expert System for Cons…Probability, statistics, and decision for civil engineers (1970)Project Management With Cpm, Pert and Precedence Diagramming (1983)Simulation Modeling and Analysis. (1983)Construction cost analysis under uncertainty with correlated cost risk analysis model (2010)A Bayesian-Driven Monte Carlo Approach for Managing Construction Schedule Risks of Infrastructures Under Uncertainty (2022)Precedence and Arrow Networking Techniques for Construction (1980)Climatic Effects on Construction (1985)Factor Model of Construction Productivity (1987)Computer‐Aided Equipment Selection for Transporting and Placing Concrete (1993)Modeling dynamic construction work template from existing scheduling records via sequential machine learning (2020)Introduction to simulation and SLAM II (1979)Operations Research -- An Introduction (1980)Controlling activity interval times in LOB scheduling (1998)Journal of Industrial Engineering (2017)Cyclone–Method for Modeling Job Site Processes (1977)Simulation Model to Forecast Project Completion Time (1985)Construction project simulation using CYCLONE (1998)Modeling the Construction Management Process to Support Situational Simulations (2003)Project execution game (PEG): training towards managing unexpected events (2007)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)STROBOSCOPE: State and Resource Based Simulation of Construction Processes (1996)Project Risk time Management – A Proposed Model and a Case Study in the Construction Industry (2015)A progress report on the training of probability assessors (1982)Calibration of probabilities: The state of the art to 1980 (1982)Judgement under Uncertainty: Heuristics and Biases (1983)Nonlinear dynamic analysis method for large-scale single-layer lattice domes with uncertain-but-bounded parameters (2019)Monte Carlo Technique with Correlated Random Variables (1992)Planning and analysis of construction operations (1992)Simplified Simulation System for Construction Projects (1998)Integrating Construction Operation and Context in Large-Scale Construction Using Hybrid Computer Simulation (2009)An Analytical Study of the PERT Assumptions (1964)Project scheduling and monitoring: current research status (2004)Exploring the adoption of technology against delays in construction projects (2022)Probability and statistics in civil engineering (1986)Optimization in operations research (1997)Agreement Between Methods of Measurement with Multiple Observations Per Individual (2007)Optimizing time, cost, environmental impact, and client satisfaction in sustainable construction projects using LHS-NSGA-III: a multi-objective approach (2024)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2020Particle Swarm Optimization Based Approach for Estimation of Costs and Duration of Construction Projects57 cited
  • 1997Combined Discrete-Event/Continuous Simulation for Project Planning57 cited
  • 2000Model for Evaluating Networks under Correlated Uncertainty—NETCOR53 cited
  • 1995HSM-Simulation–Based Planning Method for Construction Projects53 cited
  • 1992State of the art in construction simulation50 cited
  • 2009Probabilistic Duration Estimation Model for High-Rise Structural Work47 cited
  • 1990Hybrid Expert System for Construction Planning and Scheduling44 cited
  • 1993Planning repetitive construction: Current practice41 cited
  • 2005Impact of soft logic on the probabilistic duration of construction projects38 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work