SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Introduction to “Risk” Analysis
0 references·7 citing·32 second hop
Introduction to “Risk” Analysis (2006)Introduction to “Risk” AnalysisUncertainty and Risk Analysis in Petroleum Exploration and Production (2009)Uncertainty and Risk Analysis…Modeling Dependence Among Geologic Risks in Sequential Exploration Decisions (2008)Modeling Dependence Among Geo…Mixture densities for project management activity times: A robust approach to PERT (2007)Mixture densities for project…Opcje rzeczowe oraz ich zastosowanie w formułowaniu i ocenie projektów inwestycyjnych (2004)Opcje rzeczowe oraz ich zasto…An approximation of the activity duration distribution in PERT (2001)An approximation of the activ…Risk Analysis: Lessons Learned (1998)Risk Analysis: Lessons LearnedBetter Estimation of PERT Activity Time Parameters (1993)Better Estimation of PERT Act…Application of a Technique for Research and Development Program Evaluation (1959)A progress report on the training of probability assessors (1982)Judgement under Uncertainty: Heuristics and Biases (1983)A lognormal approximation of activity duration in PERT using two time estimates (2006)Effects of the application of activity calendars on the distribution of project duration in PERT networks (2013)M-PERT: Manual Project-Duration Estimation Technique for Teaching Scheduling Basics (2017)The Variation of Certain Speculative Prices (1963)The Behavior of Stock-Market Prices (1965)Autoregressive Conditional Heteroscedasticity with Estimates of the Variance of United Kingdom Inflation (1982)Setting tolerance limits for statistical project control using earned value management (2014)Adjustable robustness for multi-attribute project portfolio selection (2016)Sensitivity analysis in PERT networks: Does activity duration distribution matter? (2016)Decision analysis for petroleum exploration (1975)The Difficulty of Assessing Uncertainty (includes associated papers 6422 and 6423 and 6424 and 6425 ) (1976)A Process for Evaluating Exploration Prospects (1997)Exceptional Paper—Probability Encoding in Decision Analysis (1975)Project management : a systems approach to planning, scheduling, and controlling (1995)Talking about time: Effects of temporal planning and time awareness norms on group coordination and performance. (2003)Generating Volatility Forecasts from Value at Risk Estimates (2005)A distribution-free approach to inducing rank correlation among input variables (1982)Moment Methods for Decision Analysis (1993)Modeling Correlated Discrete Uncertainties in Event Trees with Copulas (2015)Sequential Exploration: Valuation with Geological Dependencies and Uncertain Oil Prices (2020)Risk, Uncertainty and Profit (1921)Investment Under Uncertainty. (1994)Double blind review (2011)Oil price volatility: A real option valuation approach in an African oil field (2016)Theory of games and economic behavior (2019)The Pricing of Options and Corporate Liabilities (1973)Real Options: Managerial Flexibility and Strategy in Resource Allocation (1996)Opcje rzeczywiste w finansowej ocenie efektywności inwestycji (2005)Theory of rational option pricing (2005)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 1993Better Estimation of PERT Activity Time Parameters111 cited
  • 2007Mixture densities for project management activity times: A robust approach to PERT101 cited
  • 2001An approximation of the activity duration distribution in PERT65 cited
  • 2009Uncertainty and Risk Analysis in Petroleum Exploration and Production60 cited
  • 2004Opcje rzeczowe oraz ich zastosowanie w formułowaniu i ocenie projektów inwestycyjnych38 cited
  • 2008Modeling Dependence Among Geologic Risks in Sequential Exploration Decisions35 cited
  • 1998Risk Analysis: Lessons Learned23 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work