Construction Contract Claims
0 references·6 citing·30 second hop
Construction Contract Claims (1993)Construction Contract ClaimsAn ontology-based approach for delay analysis in construction (2017)An ontology-based approach fo…Subcontracting and competitive bidding on incomplete procurement contracts (2014)Subcontracting and competitiv…PROJECT PERFORMANCE MONITORING METHODS USED IN MALAYSIA AND PERSPECTIVES OF INTRODUCING EVA AS A STANDARD APPROACH / MALAIZIJOJE NAUDOJAMI PROJEKTŲ EFEKTYVUMO STEBĖJIMO METODAI IR GALIMYBĖS EVA NAUDOTI KAIP STANDARTINĘ METODIKĄ (2011)PROJECT PERFORMANCE MONITORIN…A systemic view of dispute causation (2010)A systemic view of dispute ca…The relationship between distribution of control, fairness and potential for dispute in the claims handling process (2006)The relationship between dist…Assessing the New United Kingdom Protocol for Dealing with Delay and Disruption (2003)Assessing the New United King…The Nature of the Firm (1937)PORTFOLIO SELECTION* (1952)The Economic Institutions of Capitalism (1987)Adaptation and Vertical Integration in the Airline Industry (2009)Firms’ Qualifications and Subcontracting in Public Procurement: An Empirical Investigation (2015)Sourcing from the Enemy: Horizontal Subcontracting in Highway Procurement (2015)Project management : a systems approach to planning, scheduling, and controlling (1995)Underestimating Costs in Public Works Projects: Error or Lie? (2002)Earned Value Project Management Method and Extensions (2003)AN EARLY COST ESTIMATION MODEL FOR HYDROELECTRIC POWER PLANT PROJECTS USING NEURAL NETWORKS AND MULTIPLE REGRESSION ANALYSIS (2015)Concurrent Delays in Construction Projects (1987)Comparison of Delay Analysis Methodologies (1998)Factors of Non-Excusable Delays That Influence Contractors' Performance (1998)An investigation into the use of construction delay and disruption analysis methodologies (2008)Identification and assessment of disruption claim management risks in construction projects: a life cycle-based approach (2022)Social Behavior: Its Elementary Forms (1963)Inequity In Social Exchange (1965)Procedural Justice: A Psychological Analysis (1975)Effect of Justice on Contractor’s Relational Behavior: Moderating Role of Owner’s Asset Specificity (2020)Handbook of Industrial and Organizational Psychology. (1977)Transaction-Cost Economics: The Governance of Contractual Relations (1979)Issues Associated with Extension of Time (EoT) Claim in Malaysian Construction Industry (2013)What is Emotional Intelligence? (2015)Contractual governance as a source of institutionalised waste in construction (2017)The effects of construction delays on project delivery in Nigerian construction industry (2002)Causes and effects of delays in Malaysian construction industry (2007)The significant factors causing delay of building construction projects in Malaysia (2007)A Computerized Method for Delay Risk Assessment Based on Fuzzy Set Theory using MS Project™ (2018)Assessment of delay factors in construction of sport facilities through multi criteria decision making (2019)Study on the factors of delay in construction works (2021)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2014Subcontracting and competitive bidding on incomplete procurement contracts36 cited
  • 2010A systemic view of dispute causation33 cited
  • 2017An ontology-based approach for delay analysis in construction31 cited
  • 2011PROJECT PERFORMANCE MONITORING METHODS USED IN MALAYSIA AND PERSPECTIVES OF INTRODUCING EVA AS A STANDARD APPROACH / MALAIZIJOJE NAUDOJAMI PROJEKTŲ EFEKTYVUMO STEBĖJIMO METODAI IR GALIMYBĖS EVA NAUDOTI KAIP STANDARTINĘ METODIKĄ29 cited
  • 2003Assessing the New United Kingdom Protocol for Dealing with Delay and Disruption29 cited
  • 2006The relationship between distribution of control, fairness and potential for dispute in the claims handling process27 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work