SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Comprehensive project management: integrating optimization models, management principles, and computers
0 references·5 citing·20 second hop
Comprehensive project management: integrating optimization models, management principles, and computers (1995)Comprehensive project management: integra…Simulating Uncertainties in Construction Projects with Chronographical Scheduling Logic (2016)Simulating Uncertainties in C…Operations Research Applications (2008)Operations Research Applicati…Understanding and managing iterative error and change cycles in construction (2007)Understanding and managing it…Comparative Study of University Courses on Critical-Path Method Scheduling (2006)Comparative Study of Universi…A chronographic method for construction project planning (2006)A chronographic method for co…Introduction to System Dynamics Modeling with DYNAMO (1997)Introduction to System Dynamics Modeling with DYNAMO (1997)Business Dynamics: Systems Thinking and Modeling for a Complex World (2000)System dynamics applied to project management: a survey, assessment, and directions for future research (2007)Managing the needs of end‐users in the design and delivery of construction projects (2010)Modeling the rework cycle: capturing multiple defects per task (2010)Project Management With Cpm, Pert and Precedence Diagramming (1983)Productivity improvement in construction (1988)Earned value in project management (2003)Critical path methods in construction practice (1970)A model-based method for organizing tasks in product development (1994)Dynamic Planning and Control Methodology for Design/Build Fast-Track Construction Projects (2001)The analysis of information flow interdependencies within projects (2020)Application of a Technique for Research and Development Program Evaluation (1959)Introduction to simulation and SLAM II (1979)A Model-Based Framework to Overlap Product Development Activities (1997)Resource Leveling in Projects with Stochastic Minimum Time Lags (2019)Book Review: Time Series Analysis: Forecasting and Control (1977)Decision Systems for Inventory Management and Production Planning (1979)Forecasting seasonals and trends by exponentially weighted moving averages (2004)
this work references cited by second hop

References

No references inside the corpus for this window.

Cited by

  • 2007Understanding and managing iterative error and change cycles in construction49 cited
  • 2016Simulating Uncertainties in Construction Projects with Chronographical Scheduling Logic32 cited
  • 2006A chronographic method for construction project planning29 cited
  • 2008Operations Research Applications26 cited
  • 2006Comparative Study of University Courses on Critical-Path Method Scheduling24 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work