Design — Construction interface problems in Saudi Arabia
1 references·7 citing·26 second hop
Design — Construction interface problems in Saudi Arabia (1992)Design — Construction interface problems …Causes of Delay in Large Building Construction Projects (1995)Causes of Delay in Large Buil…Structural modelling of internal risk factors for oil and gas construction projects (2020)Structural modelling of inter…Root Causes of Design-Construction Interface Problems in Iranian Design-Build Projects (2019)Root Causes of Design-Constru…Factor analysis of the interface management (IM) problems for construction projects in Alberta (2013)Factor analysis of the interf…Subcontractor Prequalification Practices in Palestine (2010)Subcontractor Prequalificatio…How Design Consultants Perceive Potential Causes of Variation Orders for Institutional Buildings in Singapore (2005)How Design Consultants Percei…Interface Problems between Building Owners and Designers (1996)Interface Problems between Bu…Interface Problems between Owners and Maintenance Contractors in Saudi Arabia (1995)Interface Problems between Ow…Journal of Construction Engineering and Management (1983)Factors influencing construction time and cost overruns on high-rise projects in Indonesia (1997)Variation orders on construction projects: value-adding or waste? (2009)Causes of Discrepancies between Design and Construction in the Pakistan Construction Industry (2018)Change Orders: Automating Comparative Data Analysis and Controlling Impacts in Public Projects (2019)Survey Methods in Social Investigation. (1958)FACTORS AFFECTING LABOUR PRODUCTIVITY IN BUILDING PROJECTS IN THE GAZA STRIP (2007)FACTORS AFFECTING THE PRODUCTIVITY OF BUILDING CRAFTSMEN ‐ STUDIES OF UGANDA (2007)Challenges Facing Small-sized Construction Firms in the Gaza Strip (2019)Key indicators for evaluating the performance of construction companies from the perspective of owners and consultants (2022)Factors affecting the relationship between contractors and their sub‐contractors in Saudi Arabia (1993)Building Maintenance Management (1979)Causes of High Costs of Construction in Nigeria (1988)Mixing Qualitative and Quantitative Methods: Triangulation in Action (1979)What Theory is Not (1995)Determining Validity in Qualitative Inquiry (2000)Case Study Research: Design and Methods (1991)Grounded Theory (2002)Research design: qualitative, quantitative, and mixed methods approaches (2003)The partial least squares approach for structural equation modeling. (1998)PLS-SEM: Indeed a Silver Bullet (2011)A primer on partial least squares structural equation modeling (PLS-SEM) (2014)Risk Management Assessment in Oil and Gas Construction Projects Using Structural Equation Modeling (PLS-SEM) (2022)Delays in construction projects: The case of Jordan (2007)The significant factors causing delay of building construction projects in Malaysia (2007)Cost and time control of construction projects: inhibiting factors and mitigating measures in practice (2010)
this work references cited by second hop

References

  • 1995Causes of Delay in Large Building Construction Projects545 cited

Cited by

  • 2005How Design Consultants Perceive Potential Causes of Variation Orders for Institutional Buildings in Singapore36 cited
  • 2019Root Causes of Design-Construction Interface Problems in Iranian Design-Build Projects35 cited
  • 1996Interface Problems between Building Owners and Designers34 cited
  • 2013Factor analysis of the interface management (IM) problems for construction projects in Alberta31 cited
  • 2010Subcontractor Prequalification Practices in Palestine30 cited
  • 2020Structural modelling of internal risk factors for oil and gas construction projects29 cited
  • 1995Interface Problems between Owners and Maintenance Contractors in Saudi Arabia28 cited