SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Stochastic resource-constrained project scheduling
16 references·16 citing·24 second hopsampled
Stochastic resource-constrained project scheduling (2001)Stochastic resource-constrained project s…The Sample Average Approximation Method for Stochastic Discrete Optimization (2002)The Sample Average Approximat…Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Resource-constrained project …Project scheduling : recent models, algorithms, and applications (1999)Project scheduling : recent m…Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis (1999)Heuristic Algorithms for the …PSPLIB - A project scheduling problem library (1997)PSPLIB - A project scheduling…Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)Serial and parallel resource-…Robust Optimization of Large-Scale Systems (1995)Robust Optimization of Large-…A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem (1992)A Branch-and-Bound Procedure …Scenarios and Policy Aggregation in Optimization Under Uncertainty (1991)Scenarios and Policy Aggregat…Scheduling project networks with resource constraints and time windows (1988)Scheduling project networks w…Project scheduling with resource constraints: A branch and bound approach (1987)Project scheduling with resou…A guide to simulation (2nd ed.) (1986)A guide to simulation (2nd ed…Positional strategies for mean payoff games (1979)Positional strategies for mea…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Critical-Path Planning and Sc…A Network Flow Computation for Project Cost Curves (1961)A Network Flow Computation fo…Application of a Technique for Research and Development Program Evaluation (1959)Application of a Technique fo…A classification and review of approaches and methods for modeling uncertainty in projects (2019)A classification and review o…Multi-mode resource-constrained project scheduling problem with alternative project structures (2018)Multi-mode resource-constrain…Efficient priority rules for the stochastic resource-constrained project scheduling problem (2018)Efficient priority rules for …The proactive and reactive resource-constrained project scheduling problem (2017)The proactive and reactive re…New strategies for stochastic resource-constrained project scheduling (2017)New strategies for stochastic…An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations (2016)An adjustable robust optimiza…Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming (2015)Solving stochastic resource-c…Minimizing the expected makespan of a project with stochastic activity durations under resource constraints (2015)Minimizing the expected makes…Robust optimization for resource-constrained project scheduling with uncertain activity durations (2012)Robust optimization for resou…Proactive policies for the stochastic resource-constrained project scheduling problem (2011)Proactive policies for the st…Robust Project Scheduling (2009)Robust Project SchedulingResource‐Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations (2009)Resource‐Constrained Project …New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing (2009)New competitive results for t…A tabu search procedure for developing robust predictive project schedules (2007)A tabu search procedure for d…Heuristic Procedures for Reactive Project Scheduling (2006)Heuristic Procedures for Reac…Stability and resource allocation in project planning (2004)Stability and resource alloca…A stochastic programming approach for supply chain network design under uncertainty (2004)Convex Approximations of Chance Constrained Programs (2006)Lectures on Stochastic Programming: Modeling and Theory (2009)Introduction to Stochastic Programming (2011)Multiproject Scheduling with Limited Resources: A Zero-One Programming Approach (1969)Decisions with Multiple Objectives (1993)Robust solutions of uncertain linear programs (1999)Robust optimization – A comprehensive survey (2007)Theory of games and economic behavior (2019)Dual decomposition in stochastic integer programming (1999)Scenarios for Multistage Stochastic Programs (2000)Optimization under uncertainty: state-of-the-art and opportunities (2003)Ant colony optimization for resource-constrained project scheduling (2002)Project scheduling under uncertainty: Survey and research potentials (2004)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A competitive genetic algorithm for resource-constrained project scheduling (1998)Resource-constrained project scheduling: A survey of recent developments (1998)A new efficient simulated annealing algorithm for the resource-constrained project scheduling problem and its multiple mode version (2003)On Uncertainty, Ambiguity, and Complexity in Project Management (2002)Critical-path planning and scheduling (1959)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)Experimental evaluation of state-of-the-art heuristics for the resource-constrained project scheduling problem (2000)An integrated survey of deterministic project scheduling (2001)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)
this work references cited by second hop· second hop is a sample of the most-cited connections

References

  • 2002The Sample Average Approximation Method for Stochastic Discrete Optimization1,989 cited
  • 1995Robust Optimization of Large-Scale Systems1,959 cited
  • 1999Resource-constrained project scheduling: Notation, classification, models, and methods1,501 cited
  • 1991Scenarios and Policy Aggregation in Optimization Under Uncertainty1,341 cited
  • 1997PSPLIB - A project scheduling problem library1,309 cited
  • 1959Application of a Technique for Research and Development Program Evaluation932 cited
  • 1961Critical-Path Planning and Scheduling: Mathematical Basis902 cited
  • 1996Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation701 cited
  • 1992A Branch-and-Bound Procedure for the Multiple Resource-Constrained Project Scheduling Problem606 cited
  • 1999Heuristic Algorithms for the Resource-Constrained Project Scheduling Problem: Classification and Computational Analysis526 cited
  • 1986A guide to simulation (2nd ed.)484 cited
  • 1987Project scheduling with resource constraints: A branch and bound approach377 cited
  • 1988Scheduling project networks with resource constraints and time windows375 cited
  • 1961A Network Flow Computation for Project Cost Curves366 cited
  • 1979

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Positional strategies for mean payoff games
360 cited
  • 1999Project scheduling : recent models, algorithms, and applications352 cited
  • Cited by

    • 2004Stability and resource allocation in project planning145 cited
    • 2016An adjustable robust optimization model for the resource-constrained project scheduling problem with uncertain activity durations142 cited
    • 2007A tabu search procedure for developing robust predictive project schedules141 cited
    • 2009Resource‐Constrained Project Scheduling for Timely Project Completion with Stochastic Activity Durations131 cited
    • 2012Robust optimization for resource-constrained project scheduling with uncertain activity durations129 cited
    • 2009New competitive results for the stochastic resource-constrained project scheduling problem: exploring the benefits of pre-processing125 cited
    • 2006Heuristic Procedures for Reactive Project Scheduling123 cited
    • 2011Proactive policies for the stochastic resource-constrained project scheduling problem122 cited
    • 2015Solving stochastic resource-constrained project scheduling problems by closed-loop approximate dynamic programming118 cited
    • 2018Efficient priority rules for the stochastic resource-constrained project scheduling problem117 cited
    • 2017New strategies for stochastic resource-constrained project scheduling104 cited
    • 2019A classification and review of approaches and methods for modeling uncertainty in projects103 cited
    • 2015Minimizing the expected makespan of a project with stochastic activity durations under resource constraints98 cited
    • 2017The proactive and reactive resource-constrained project scheduling problem78 cited
    • 2018Multi-mode resource-constrained project scheduling problem with alternative project structures77 cited
    • 2009Robust Project Scheduling63 cited