Continuous Precedence Relations for Better Modelling Overlapping Activities
4 references·0 citing·15 second hop
Continuous Precedence Relations for Better Modelling Overlapping Activities (2015)Continuous Precedence Relations for Bette…CPM Schedule Summarizing Function of the Beeline Diagramming Method (2012)CPM Schedule Summarizing Func…Productivity Scheduling Method: Linear Schedule Analysis with Singularity Functions (2009)Productivity Scheduling Metho…Decision Support for Project Management using A Chronographic Approach (2002)Decision Support for Project …A NON-COMPUTER APPROACH TO THE CRITICAL PATH METHOD FOR THE CONSTRUCTION INDUSTRY (1962)A NON-COMPUTER APPROACH TO TH…Application of a Technique for Research and Development Program Evaluation (1959)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Journal of Construction Engineering and Management (1983)A chronographic method for construction project planning (2006)RPM: Repetitive Project Modeling (1990)Linear Scheduling Model: Development of Controlling Activity Path (1998)Scheduling Projects with Repeating Activities (1998)Challenges and opportunities for productivity improvement studies in linear, repetitive, and location-based scheduling (2013)Scheduling Optimization of Linear Schedule with Constraint Programming (2017)A constraint programming approach for scheduling repetitive projects with atypical activities considering soft logic (2019)Precedence and Arrow Networking Techniques for Construction (1980)Construction Project Scheduling (1991)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Resource-Activity Critical-Path Method for Construction Planning (2003)A review of methods and algorithms for optimizing construction scheduling (2013)
this work references cited by second hop

References

  • 1962A NON-COMPUTER APPROACH TO THE CRITICAL PATH METHOD FOR THE CONSTRUCTION INDUSTRY157 cited
  • 2009Productivity Scheduling Method: Linear Schedule Analysis with Singularity Functions66 cited
  • 2002Decision Support for Project Management using A Chronographic Approach30 cited
  • 2012CPM Schedule Summarizing Function of the Beeline Diagramming Method29 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work