An Assessment of the Factors Causing Delays on Building Construction Projects in Uganda
16 references·10 citing·25 second hop
An Assessment of the Factors Causing Delays on Building Construction Projects in Uganda (2014)An Assessment of the Factors Causing Dela…Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey (2012)Quantification of Delay Facto…Analysing factors affecting delays in Indian construction projects (2011)Analysing factors affecting d…Cost and time control of construction projects: inhibiting factors and mitigating measures in practice (2010)Cost and time control of cons…Causes of delays in Saudi Arabian public sector construction projects (2009)Causes of delays in Saudi Ara…Causes of Delay in Building Construction Projects in Egypt (2008)Causes of Delay in Building C…Causes and effects of delays in Malaysian construction industry (2007)Causes and effects of delays …Significant factors causing delay in the UAE construction industry (2006)Significant factors causing d…Construction Delays in Hong Kong Civil Engineering Projects (2006)Construction Delays in Hong K…Construction Delays and Their Causative Factors in Nigeria (2006)Construction Delays and Their…Causes of delay in large construction projects (2006)Causes of delay in large cons…Factors affecting cost performance: evidence from Indian construction projects (2005)Factors affecting cost perfor…Contributors to construction delays (1998)Contributors to construction …A comparative study of causes of time overruns in Hong Kong construction projects (1997)A comparative study of causes…Causes of Delay in Large Building Construction Projects (1995)Causes of Delay in Large Buil…Causes of delay and cost overruns in Nigerian construction projects (1994)Causes of delay and cost over…Determining Sample Size for Research Activities (1970)Determining Sample Size for R…Scaling the changes in lifestyle, attitude, and behavioral patterns among COVID-19 vaccinated people: insights from Bangladesh (2022)Scaling the changes in lifest…Factors influencing the quality of low-income housing in Polokwane Municipality South Africa (2021)Factors influencing the quali…Causes of Problems in Post-Disaster Emergency Re-Construction Projects—Iraq as a Case Study (2021)Causes of Problems in Post-Di…An Empirical Study of Major Factors Affecting Productivity of Construction Projects (2020)An Empirical Study of Major F…Major Factors Causing Delay in the Delivery of Manufacturing and Building Projects in Saudi Arabia (2019)Major Factors Causing Delay i…Design Changes in Construction Projects – Causes and Impact on the Cost (2019)Design Changes in Constructio…The causes, impacts and mitigations of delay in megaprojects in the Sultanate of Oman (2017)The causes, impacts and mitig…Determining the potential and requirements of transit-oriented development (TOD) (2017)Determining the potential and…A hybrid SD-DEMATEL approach to develop a delay model for construction projects (2017)A hybrid SD-DEMATEL approach …Estimated Cost at Completion: Integrating Risk into Earned Value Management (2016)Estimated Cost at Completion:…Project management: A systems approach to planning, scheduling and controlling (1982)Project management : a systems approach to planning, scheduling, and controlling (1995)Target value design: using collaboration and a lean approach to reduce construction cost (2012)Factors Affecting Schedule Delay, Cost Overrun, and Quality Level in Public Construction Projects (2015)Impact of inflation rate on construction projects budget: A review (2020)How Many Interviews Are Enough? (2005)Machine Learning Algorithms for Construction Projects Delay Risk Prediction (2019)An Index of Factorial Simplicity (1974)Cost Overruns and Failure in Project Management: Understanding the Roles of Key Stakeholders in Construction Projects (2012)Exploring delay causes of road construction projects in Egypt (2016)The essentials of factor analysis (1970)Critical Success Factors for Different Project Objectives (1999)FACTORS AFFECTING THE PERFORMANCE OF CONSTRUCTION PROJECTS IN THE GAZA STRIP (2009)Factors influencing construction time and cost overruns on high-rise projects in Indonesia (1997)Construction delay: a quantitative analysis (2000)Causes of construction delay: traditional contracts (2002)Delays in construction projects: The case of Jordan (2007)Research methods for business: A skill building approach (1993)The impact of culture and governance on corporate social reporting (2005)The influence of eWOM in social media on consumers’ purchase intentions: An extended approach to information adoption (2016)Sample Size for Survey Research: Review and Recommendations (2020)Delay and cost overruns in Vietnam large construction projects: A comparison with other selected countries (2008)Criteria of project success: an exploratory re-examination (1999)Factors Affecting the Success of a Construction Project (2004)The significant factors causing delay of building construction projects in Malaysia (2007)
this work references cited by second hop

References

  • 1970Determining Sample Size for Research Activities18,904 cited
  • 2006Causes of delay in large construction projects1,721 cited
  • 2007Causes and effects of delays in Malaysian construction industry1,428 cited
  • 1997A comparative study of causes of time overruns in Hong Kong construction projects831 cited
  • 2011Analysing factors affecting delays in Indian construction projects748 cited
  • 2006Significant factors causing delay in the UAE construction industry552 cited
  • 1995Causes of Delay in Large Building Construction Projects545 cited
  • 2005Factors affecting cost performance: evidence from Indian construction projects506 cited
  • 2010Cost and time control of construction projects: inhibiting factors and mitigating measures in practice478 cited
  • 2008Causes of Delay in Building Construction Projects in Egypt464 cited
  • 1994Causes of delay and cost overruns in Nigerian construction projects457 cited
  • 2012Quantification of Delay Factors Using the Relative Importance Index Method for Construction Projects in Turkey444 cited
  • 2006Construction Delays and Their Causative Factors in Nigeria350 cited
  • 2009Causes of delays in Saudi Arabian public sector construction projects331 cited
  • 2006

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

Construction Delays in Hong Kong Civil Engineering Projects
304 cited
  • 1998Contributors to construction delays239 cited
  • Cited by

    • 2019Design Changes in Construction Projects – Causes and Impact on the Cost84 cited
    • 2016Estimated Cost at Completion: Integrating Risk into Earned Value Management71 cited
    • 2017The causes, impacts and mitigations of delay in megaprojects in the Sultanate of Oman59 cited
    • 2021Causes of Problems in Post-Disaster Emergency Re-Construction Projects—Iraq as a Case Study55 cited
    • 2017A hybrid SD-DEMATEL approach to develop a delay model for construction projects55 cited
    • 2020An Empirical Study of Major Factors Affecting Productivity of Construction Projects47 cited
    • 2019Major Factors Causing Delay in the Delivery of Manufacturing and Building Projects in Saudi Arabia40 cited
    • 2022Scaling the changes in lifestyle, attitude, and behavioral patterns among COVID-19 vaccinated people: insights from Bangladesh39 cited
    • 2017Determining the potential and requirements of transit-oriented development (TOD)19 cited
    • 2021Factors influencing the quality of low-income housing in Polokwane Municipality South Africa8 cited