SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
PENENTUAN WAKTU STANDAR DAN JUMLAH TENAGA KERJA OPTIMAL PADA PRODUKSI BATIK CAP (STUDI KASUS: IKM BATIK SAUD EFFENDY, LAWEYAN)
2 references·1 citing·11 second hop
PENENTUAN WAKTU STANDAR DAN JUMLAH TENAGA KERJA OPTIMAL PADA PRODUKSI BATIK CAP (STUDI KASUS: IKM BATIK SAUD EFFENDY, LAWEYAN) (2013)PENENTUAN WAKTU STANDAR DAN JUMLAH TENAGA…Motion and Time Study (1976)Motion and Time StudyMotion and Time Study : Design and Measurement of Work (1968)Motion and Time Study : Desig…Upaya Pengembangan Industri Batik di Indonesia (2020)Upaya Pengembangan Industri B…Analisis Industri Batik Di Indonesia (2008)ANALISIS PENERAPAN TAX PLANNING ATAS PAJAK PENGHASILAN BADAN (2013)PERLINDUNGAN HUKUM TERHADAP KEBUDAYAAN MELALUI WORLD HERITAGE CENTRE UNESCO (2018)IKLIM KEWIRAUSAHAAN DAN KOMPETENSI KEWIRAUSAHAAN: UPAYA UNTUK MENINGKATKAN KINERJA USAHA (STUDI PADA UMKM BATIK TULIS BAYAT, KLATEN) (2020)Model of Entrepreneurship and Digital Technology in Responding to Green and Non‐Green Innovation: Case Study of Batik SMEs in Indonesia (2025)Effects of workplace thermal conditions on safe work behavior (1983)Interdisciplinary approaches to job design: A constructive replication with extensions. (1988)PATH: A work sampling-based approach to ergonomic job analysis for construction and other non-repetitive work (1996)Computational survey of univariate and multivariate learning curve models (1992)The criterion problem: 1917-1992. (1992)Cognitive Lock-In and the Power Law of Practice (2003)
this work references cited by second hop

References

  • 1968Motion and Time Study : Design and Measurement of Work554 cited
  • 1976Motion and Time Study290 cited

Cited by

  • 2020Upaya Pengembangan Industri Batik di Indonesia56 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work