Management of production in construction: A theoretical view
4 references·16 citing·42 second hop
Management of production in construction: A theoretical view (1999)Management of production in construction:…Shielding Production: Essential Step in Production Control (1998)Shielding Production: Essenti…Factory Physics : Foundations of Manufacturing Management (1995)Factory Physics : Foundations…Éléments d'économie politique pure, ou, Théorie de la richesse sociale (1976)Éléments d'économie politique…A Proof for the Queuing Formula: L = λ W (1961)A Proof for the Queuing Formu…Adaptive control of resource flow to optimize construction work and cash flow via online deep reinforcement learning (2023)Adaptive control of resource …Benefits and challenges to applying IPD: experiences from a Norwegian mega-project (2021)Benefits and challenges to ap…A conceptual hybrid project management model for construction projects (2021)A conceptual hybrid project m…Understanding Relative Importance of Barriers to Improving the Customer–Supplier Relationship within Construction Supply Chains Using DEMATEL Technique (2019)Understanding Relative Import…Identifying and Managing Critical Waste Factors for Lean Construction Projects (2019)Identifying and Managing Crit…How can ‘tasks made ready’ during lookahead planning impact reliable workflow and project duration? (2015)How can ‘tasks made ready’ du…Takt-Time Planning and the Last Planner (2014)Takt-Time Planning and the La…Reverse Logistics for the Construction Industry: Lessons from the Manufacturing Context (2014)Reverse Logistics for the Con…The logistics of construction supply chains: the builders' merchant perspective (2010)The logistics of construction…Management Thinking in the Earned Value Method System and the Last Planner System (2010)Management Thinking in the Ea…Flow modelling of construction site materials and waste logistics (2008)Flow modelling of constructio…Concurrent Engineering in Construction Projects (2006)Concurrent Engineering in Con…Consequences of competitive bidding in project-based production (2005)Consequences of competitive b…Reliability Buffering for Construction Projects (2004)Reliability Buffering for Con…The Theory of Project Management: Explanation to Novel Methods (2002)The Theory of Project Managem…Is the Earned-Value Method an Enemy of Work Flow? (2000)Is the Earned-Value Method an…Simulation Modeling and Analysis. (1983)Project management : a systems approach to planning, scheduling, and controlling (1995)Research Design: Qualitative, Quantitative, and Mixed Methods Approaches (2009)The relationship between the last planner® system and collaborative planning practice in UK construction (2017)Advanced Metrics for Construction Planning (2019)Survey Comparing Critical Path Method, Last Planner System, and Location-Based Techniques (2019)An exploration towards a production theory and its application to construction (2000)THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL (2000)The Toyota way : 14 management principles from the world's greatest manufacturer (2004)The Last Planner System in China's construction industry — A SWOT analysis on implementation (2014)Improving workflow and resource usage in construction schedules through location-based management system (LBMS) (2018)Strengths and shortcomings of methodologies for production planning and control of construction projects: a systematic literature review and future perspectives (2020)Statistical Method from the Viewpoint of Quality Control. (1940)Is structural change the primary solution to the problems of construction? (2003)Should project management be based on theories of economics or production? (2006)Construction Industry Institute (2007)Qualitative research and evaluation methods (1980)Towards a Methodology for Developing Evidence‐Informed Management Knowledge by Means of Systematic Review (2003)The impact of supply chain integration on performance: A contingency and configuration approach (2009)Extending lean frontiers: a kaizen case study in an Italian MTO manufacturing company (2019)Stakeholder-Associated Life Cycle Risks in Construction Supply Chain (2020)Coefficient Alpha and the Internal Structure of Tests (1951)A Second Generation Little Jiffy (1970)International Journal of Business and Social Science (2018)"Low-Income Housing Backlogs and Deficits “Blues” in South Africa. What Solutions Can a Lean Construction Approach Proffer? " (2019)Inefficiencies in the delivery of low-income housing in South Africa: is governance the missing link? A review of literature (2022)Project management: A systems approach to planning, scheduling and controlling (1982)A Guide to the project management body of knowledge (1996)Toyota production system: beyond large-scale production (1998)Applicability-Compatibility Analysis of PMBOK Seventh Edition from the Perspective of the Construction Industry Distinctive Peculiarities (2022)Information tools for project management of industrial enterprises development (2022)The role of artificial intelligence on supply chain resilience (2025)Monopolistic Competition and General Equilibrium (1989)Three Sides of Harberger Triangles (1999)Biological trade and markets (2016)On theory in operations management (1998)The four roles of supply chain management in construction (2000)An Equilibrium Queuing Model of Bribery (1985)How to improve R&D productivity: the pharmaceutical industry's grand challenge (2010)Parade Game: Impact of Work Flow Variability on Trade Performance (1999)Lean project management (2003)The Underlying Theory of Project Management Is Obsolete (2008)
this work references cited by second hop

References

  • 1961A Proof for the Queuing Formula: L = λ W2,777 cited
  • 1995Factory Physics : Foundations of Manufacturing Management1,349 cited
  • 1998Shielding Production: Essential Step in Production Control510 cited
  • 1976Éléments d'économie politique pure, ou, Théorie de la richesse sociale307 cited

Cited by

  • 2002The Theory of Project Management: Explanation to Novel Methods134 cited
  • 2019Understanding Relative Importance of Barriers to Improving the Customer–Supplier Relationship within Construction Supply Chains Using DEMATEL Technique97 cited
  • 2010Management Thinking in the Earned Value Method System and the Last Planner System89 cited
  • 2021A conceptual hybrid project management model for construction projects85 cited
  • 2015How can ‘tasks made ready’ during lookahead planning impact reliable workflow and project duration?78 cited
  • 2019Identifying and Managing Critical Waste Factors for Lean Construction Projects76 cited
  • 2004Reliability Buffering for Construction Projects74 cited
  • 2010The logistics of construction supply chains: the builders' merchant perspective60 cited
  • 2021Benefits and challenges to applying IPD: experiences from a Norwegian mega-project58 cited
  • 2023Adaptive control of resource flow to optimize construction work and cash flow via online deep reinforcement learning

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

54 cited
  • 2005Consequences of competitive bidding in project-based production51 cited
  • 2000Is the Earned-Value Method an Enemy of Work Flow?43 cited
  • 2014Takt-Time Planning and the Last Planner43 cited
  • 2006Concurrent Engineering in Construction Projects42 cited
  • 2014Reverse Logistics for the Construction Industry: Lessons from the Manufacturing Context41 cited
  • 2008Flow modelling of construction site materials and waste logistics38 cited