SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
An integrated single-vendor single-buyer targeting problem with time-dependent process mean
16 references·0 citing·30 second hop
An integrated single-vendor single-buyer targeting problem with time-dependent process mean (2012)An integrated single-vendor single-buyer …Vendor-Managed Inventory model for single-vendor single-buyer Supply Chain (2011)Vendor-Managed Inventory mode…Performance measurements in supply chains within Swedish industry (2011)Performance measurements in s…Economic selection of process mean for single-vendor single-buyer supply chain (2008)Economic selection of process…The joint economic lot sizing problem: Review and extensions (2007)The joint economic lot sizing…Optimal production and shipment models for a single-vendor–single-buyer integrated system (2006)Optimal production and shipme…Joint optimization of process target mean and tolerance limits with measurement errors under multi-decision alternatives (2006)Joint optimization of process…Another look at the single-vendor single-buyer integrated production-inventory problem (2005)Another look at the single-ve…A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer (2005)A heuristic solution procedur…Joint determination of target value and production run for a process with multiple markets (2004)Joint determination of target…Determination of economic production–shipment policy for a single-vendor–single-buyer system (2000)Determination of economic pro…The single-vendor single-buyer integrated production-inventory model with a generalised policy (1997)The single-vendor single-buye…A one-vendor multi-buyer integrated inventory model: A comment (1995)A one-vendor multi-buyer inte…“A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT* (1988)“A JOINT ECONOMIC‐LOT‐SIZE MO…A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR (1986)A JOINT ECONOMIC‐LOT‐SIZE MOD…Economic Selection of Quality Manufactured Product (1984)Economic Selection of Quality…Finding an Optimum Target Value in Relation to a Fixed Lower Limit and an Arbitrary Upper Limit (1962)Finding an Optimum Target Val…A one-vendor multi-buyer integrated inventory model (1995)A hybrid vendor managed inventory and redundancy allocation optimization problem in supply chain management: An NSGA-II with tuned parameters (2013)Optimizing a multi-vendor multi-retailer vendor managed inventory problem: Two tuned meta-heuristic algorithms (2013)Optimizing a hybrid vendor-managed inventory and transportation problem with fuzzy demand: An improved particle swarm optimization algorithm (2014)An Analytical Determination of Lead Time with Normal Demand (1991)An integrated vendor–buyer inventory model with backorder price discount and effective investment to reduce ordering cost (2008)An integrated vendor–buyer model with stock-dependent demand (2010)A joint economic lot size model with price and environmentally sensitive demand (2014)An integrated inventory model for a single supplier-single customer problem (1977)An optimal policy for a single-vendor single-buyer integrated production–inventory problem with process unreliability consideration (2003)Optimizing inventory decisions in a multi-stage multi-customer supply chain (2003)Analysis of Inventory Systems. (1964)Vendor selection criteria and methods (1991)Coordinated supply chain management (1996)Economic control of quality of manufactured product (1932)Economic Control of Quality of Manufactured Product. (1932)Statistical Method from the Viewpoint of Quality Control. (1940)Determination of the Best Mean Contents for aCanning Problem (1987)Penalties, rewards, and inspection: provisions for quality in supply chain contracts (2001)A joint design of production run length, maintenance policy and control chart with multiple assignable causes (2016)Coordinating supply chain inventories through common replenishment epochs (2001)Buyer vendor coordination models in supply chain management (2005)The joint economic lot size problem: A review (2011)Coordination mechanisms of supply chain systems (2006)Vendor managed inventory model for single-vendor multi-retailer supply chains (2009)The lot sizing problem: A tertiary study (2013)Joint Economic Lot-sizing in Multi-product Multi-level Integrated Supply Chains: Generalized Benders Decomposition (2019)Economic design of product specifications for a complete inspection plan (1988)The Optimum Target Value for Single Filling Operations with Quality Sampling Plans (1991)Integrated model for determining the optimal initial settings of the process mean and the optimal production run assuming quadratic loss functions (2004)
this work references cited by second hop

References

  • 1986A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR1,034 cited
  • 1988“A JOINT ECONOMIC‐LOT‐SIZE MODEL FOR PURCHASER AND VENDOR”: A COMMENT*646 cited
  • 1997The single-vendor single-buyer integrated production-inventory model with a generalised policy495 cited
  • 1995A one-vendor multi-buyer integrated inventory model: A comment322 cited
  • 2000Determination of economic production–shipment policy for a single-vendor–single-buyer system261 cited
  • 2007The joint economic lot sizing problem: Review and extensions234 cited
  • 1984Economic Selection of Quality Manufactured Product154 cited
  • 2005Another look at the single-vendor single-buyer integrated production-inventory problem147 cited
  • 1962Finding an Optimum Target Value in Relation to a Fixed Lower Limit and an Arbitrary Upper Limit90 cited
  • 2005A heuristic solution procedure for an integrated inventory system under controllable lead-time with equal or unequal sized batch shipments between a vendor and a buyer86 cited
  • 2006Optimal production and shipment models for a single-vendor–single-buyer integrated system77 cited
  • 2008Economic selection of process mean for single-vendor single-buyer supply chain44 cited
  • 2004Joint determination of target value and production run for a process with multiple markets40 cited
  • 2011Performance measurements in supply chains within Swedish industry

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

30 cited
  • 2011Vendor-Managed Inventory model for single-vendor single-buyer Supply Chain20 cited
  • 2006Joint optimization of process target mean and tolerance limits with measurement errors under multi-decision alternatives14 cited
  • Cited by

    No citing works inside the corpus for this window.