Usage and benefits of project risk analysis and management
1 references·11 citing·45 second hop
Usage and benefits of project risk analysis and management (1994)Usage and benefits of project risk analys…Risk Analysis and Its Applications (1984)Risk Analysis and Its Applica…Which Risk Management Is Most Crucial for Controlling Project Cost? (2017)Which Risk Management Is Most…Using Nash bargaining to design project management contracts under cost uncertainty (2013)Using Nash bargaining to desi…Construction project risk management in Singapore: Resources, effectiveness, impact, and understanding (2013)Construction project risk man…A scheduling methodology for dealing with uncertainty in construction projects (2011)A scheduling methodology for …Perceptions of Singapore construction contractors on construction risk identification (2008)Perceptions of Singapore cons…A risk identification procedure for construction contracts—a case study of power station projects in Egypt (2007)A risk identification procedu…Managing Project Risks as Knowledge Gaps (2006)Managing Project Risks as Kno…A CRITICAL REVIEW OF RISK MANAGEMENT SUPPORT TOOLS (2004)A CRITICAL REVIEW OF RISK MAN…Robust Reliability of Projects with Activity-Duration Uncertainty (1998)Robust Reliability of Project…A knowledge-based system for identifying potential project risks (1998)A knowledge-based system for …Fundamentals of the total ethical-risk analysis method (TERAmethod) with a study of crucial problems in managing distributed multimedia (1996)Fundamentals of the total eth…Risk Management and Construction (1993)Risk analysis and management in construction (1997)Project Risk Management: Processes, Techniques and Insights (1998)Approaches to Risk Identification in Public–Private Partnership Projects: Malaysian Private Partners’ Overview (2019)Natural Language Processing with Multitask Classification for Semantic Prediction of Risk-Handling Actions in Construction Contracts (2023)Construction Claims and Disputes: Causes and Cost/Time Overruns (1994)Integrated Methodology for Project Risk Management (2002)Heuristic approach for risk assessment modeling: EPCCM application (Engineer Procure Construct Contract Management) (2012)Assessing the Impact of Construction Risks on Cost Overruns: A Risk Path Simulation–Driven Approach (2022)The role of contract incompleteness factors in project disputes: a hybrid fuzzy multi-criteria decision approach (2022)The Nature of Managerial Work (1974)Competing Against Time (1990)Developing products in half the time (1991)Development of multi-party risk and uncertainty management process for an infrastructure project (2004)THE METHOD FOR IMPROVING STABILITY OF CONSTRUCTION PROJECT SCHEDULES THROUGH BUFFER ALLOCATION / STATYBOS VYKDYMO GRAFIKO STABILUMO UŽTIKRINIMAS PASKIRSTANT LAIKO REZERVUS (2011)The Bargaining Problem (1950)Perfect Equilibrium in a Bargaining Model (1982)A Theory of Incentives in Procurement and Regulation (1993)Extensions of earned value management: Using the earned incentive metric to improve signal quality (2016)Applications of Game Theory in Project Management: A Structured Review and Analysis (2019)Analyzing coordination strategy of circular supply chain in re‐commerce industry: A game theoretic approach (2022)Risk Analysis for Large Projects: Models, Methods and Cases (1987)Project risk assessment using the analytic hierarchy process (1991)Knowledge-based risk identification in infrastructure projects (2003)Project execution game (PEG): training towards managing unexpected events (2007)SCRIS (2012)Transforming project risk management into project uncertainty management (2002)Understanding the key risks in construction projects in China (2007)Enterprise risk management implementation in construction firms (2014)Enterprise risk management in international construction firms: drivers and hindrances (2015)An enterprise risk management knowledge-based decision support system for construction firms (2016)Management of risks, uncertainties and opportunities on projects: time for a fundamental shift (2001)A guide to the project management body of knowledge (PMBOK guide) (2004)Applying a risk assessment approach for cost analysis and decision-making: a case study for a basic design engineering project (2017)Risk Assessment in Bridge Construction Projects in Iran Using Monte Carlo Simulation Technique (2019)Development of Model to Predict Natural Disaster-Induced Financial Losses for Construction Projects Using Deep Learning Techniques (2021)Project Risk Management: Processes, Techniques and Insights. (1998)Info-Gap Decision Theory: Decisions Under Severe Uncertainty (2006)A Guide to the project management body of knowledge (1996)A multiobjective optimization method considering process risk correlation for project risk response planning (2018)Effects of Risk Attitude and Controllability Assumption on Risk Ratings: Observational Study on International Construction Project Risk Assessment (2018)Predictive risk modeling for major transportation projects using historical data (2022)The role of risk and return in information technology outsourcing decisions (1995)The controlling influences on effective risk identification and assessment for construction design management (2001)Project risk management methodology for small firms (2013)
this work references cited by second hop

References

  • 1984Risk Analysis and Its Applications219 cited

Cited by

  • 2017Which Risk Management Is Most Crucial for Controlling Project Cost?61 cited
  • 2008Perceptions of Singapore construction contractors on construction risk identification59 cited
  • 2013Construction project risk management in Singapore: Resources, effectiveness, impact, and understanding56 cited
  • 1998A knowledge-based system for identifying potential project risks52 cited
  • 2004A CRITICAL REVIEW OF RISK MANAGEMENT SUPPORT TOOLS45 cited
  • 2013Using Nash bargaining to design project management contracts under cost uncertainty44 cited
  • 1998Robust Reliability of Projects with Activity-Duration Uncertainty36 cited
  • 2006Managing Project Risks as Knowledge Gaps36 cited
  • 2007A risk identification procedure for construction contracts—a case study of power station projects in Egypt33 cited
  • 2011A scheduling methodology for dealing with uncertainty in construction projects32 cited
  • 1996Fundamentals of the total ethical-risk analysis method (TERAmethod) with a study of crucial problems in managing distributed multimedia4 cited