SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
A building cost estimation model based on cost significant work packages
3 references·2 citing·15 second hop
A building cost estimation model based on cost significant work packages (2005)A building cost estimation model based on…Analysis of factors influencing project cost estimating practice (2000)Analysis of factors influenci…Building Economics (1983)Building EconomicsCost Planning of Buildings (1970)Cost Planning of BuildingsTrend of the Research on Public Funded Projects (2013)Trend of the Research on Publ…Elemental cost format for building conservation works in Malaysia (2010)Elemental cost format for bui…Building Economics (1996)Cost Studies of Buildings (2013)Evaluating the risks of public private partnerships for infrastructure projects (2002)The allocation of risk in PPP/PFI construction projects in the UK (2004)Comparison of PubMed, Scopus, Web of Science, and Google Scholar: strengths and weaknesses (2007)A best practice framework for public-private partnership implementation for construction projects in developing countries (2018)The role of managerial actions in the cost, time and quality performance of high-rise commercial building projects (1985)Critical Success Factors for Value Management Studies in Construction (2003)Critical determinants of construction tendering costs: Quantity surveyors’ standpoint (2005)Large construction projects in developing countries: a case study from Vietnam (2004)Critical Success Factors for PPPs in Infrastructure Developments: Chinese Perspective (2010)Public private partnership projects in Singapore: Factors, critical risks and preferred risk allocation from the perspective of contractors (2012)Cost modelling and price forecasting: practice and theory in perspective (1985)Interpersonal communication in cost planning during the building design phase (1996)Developing Structural Integrated Stressor–Stress Models for Clients’ and Contractors’ Cost Engineers (2008)
this work references cited by second hop

References

  • 2000Analysis of factors influencing project cost estimating practice609 cited
  • 1970Cost Planning of Buildings112 cited
  • 1983Building Economics36 cited

Cited by

  • 2013Trend of the Research on Public Funded Projects32 cited
  • 2010Elemental cost format for building conservation works in Malaysia8 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work