No open-access location is known for this record yet.
No open-access location is known for this record yet.
Abstract In this paper the effects of inspector error on a cost‐based quality control system are investigated. The system examined is of a single sampling plan design involving several cost components. Both type I and type II inspector errors are considered. The model employs a process distribution, thus assuming that a stochastic process of some kind governs the quality of incoming lots. Optimal plan design is investigated under both error‐free and error‐prone inspection procedures and some comparisons are made.
Loading…
Stored only when both papers are in the corpus — 45 citations exist upstream.
Papers that cite the same references — the relational fallback while embeddings are still backfilling.
Imported from OpenAlex (CC0) — nothing here is generated.