No open-access location is known for this record yet.
No open-access location is known for this record yet.
The specifics of models used for the preliminary estimation of projects is considered. Different approaches to the construction of similar models are analyzed. A model construction procedure that takes into account the specifics of projects in the field of nanoindustry and provides the consistent description of various project characteristics during the transformation of a model from the space of states into the space of goals is proposed.
Loading…
Stored only when both papers are in the corpus — 4 citations exist upstream.
Papers that cite the same references — the relational fallback while embeddings are still backfilling.
Imported from OpenAlex (CC0) — nothing here is generated.