SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
“Claimsmanship”: Current Perspective
1 references·7 citing·32 second hop
“Claimsmanship”: Current Perspective (1993)“Claimsmanship”: Current PerspectiveConstruction Scheduling: Preparation, Liability, and Claims (1991)Construction Scheduling: Prep…Integrated Approach to Overcome Shortcomings in Current Delay Analysis Practices (2014)Integrated Approach to Overco…Collaborative incentive contracts: stimulating competitive behaviour without competition (2014)Collaborative incentive contr…FLORA: New Forensic Schedule Analysis Technique (2008)FLORA: New Forensic Schedule …Claims management in the Egyptian industrial construction sector: a contractor's perspective (2008)Claims management in the Egyp…An investigation into the use of construction delay and disruption analysis methodologies (2008)An investigation into the use…Record keeping for contemporaneous delay analysis: a model for effective event management (2006)Record keeping for contempora…Assessing the New United Kingdom Protocol for Dealing with Delay and Disruption (2003)Assessing the New United King…Concurrent Delays in Construction Projects (1987)Comparison of Delay Analysis Methodologies (1998)Factors of Non-Excusable Delays That Influence Contractors' Performance (1998)Identification and assessment of disruption claim management risks in construction projects: a life cycle-based approach (2022)The Norm of Reciprocity: A Preliminary Statement (1960)Markets and Hierarchies (1975)A Theory of Fairness, Competition, and Cooperation (1999)Preparing a framework for two-stage target-cost arrangement formulation (2015)Solving design management problems using lean design management: the role of trust (2019)Power of Incentivization in Construction Dispute Avoidance (2020)Causes of Quality Deviations in Design and Construction (1992)Construction Claims and Disputes: Causes and Cost/Time Overruns (1994)Impact of Change Orders on Labor Efficiency for Electrical Construction (1999)Construction Delay Claims (1987)Assessing Extension of Time delays on major projects (2002)Structuring a delay and disruption claim: An application of cause-mapping and system dynamics (2003)Using control systems to improve construction project outcomes (2013)Quantifying the causes and costs of rework in construction (2000)Selecting a delay analysis method in resolving construction claims (2005)System dynamics applied to project management: a survey, assessment, and directions for future research (2007)The Nature of Managerial Work (1974)Case Study Research: Design and Methods (1984)Decisions with Multiple Objectives: Preferences and Value Tradeoffs. (1994)Appropriate delay analysis techniques to analyse delays in road construction projects in Sri Lanka (2016)Design for occupational safety and health: key attributes for organisational capability (2019)Construction delay analysis techniques (1996)Construction Delay Computation Method (2001)Concurrent Delays and Apportionment of Damages (2010)Review of Resource-Constrained Scheduling Algorithms (2019)Preallocation of Total Float in the Application of a Critical Path Method Based Construction Contract (2007)Analysis Methods in Time-Based Claims (2008)Investigating Causes of Delay in U.S. Construction Projects. (2017)
this work references cited by second hop

References

  • 1991Construction Scheduling: Preparation, Liability, and Claims51 cited

Cited by

  • 2014Collaborative incentive contracts: stimulating competitive behaviour without competition37 cited
  • 2006Record keeping for contemporaneous delay analysis: a model for effective event management31 cited
  • 2003Assessing the New United Kingdom Protocol for Dealing with Delay and Disruption29 cited
  • 2008Claims management in the Egyptian industrial construction sector: a contractor's perspective29 cited
  • 2008FLORA: New Forensic Schedule Analysis Technique29 cited
  • 2008An investigation into the use of construction delay and disruption analysis methodologies29 cited
  • 2014Integrated Approach to Overcome Shortcomings in Current Delay Analysis Practices25 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work