SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
An aggregate model of project-oriented production
5 references·0 citing·19 second hop
An aggregate model of project-oriented production (1989)An aggregate model of project-oriented pr…A General Framework for Modeling Production (1989)A General Framework for Model…Project Management: Methods and Studies (1986)Project Management: Methods a…Multi-Project Scheduling: Categorization of Heuristic Rules Performance (1982)Multi-Project Scheduling: Cat…Precedence and Arrow Networking Techniques for Construction (1980)Precedence and Arrow Networki…Managing high-technology programs and projects (1976)Managing high-technology prog…Theory of Cost and Production Functions. (1972)Production and inventory management (1983)An efficiency measurement framework for multi-stage production systems (2006)Manufacturing Planning and Control (2009)Theory of Cost and Production Functions (2015)A survey of semiconductor supply chain models part III: master planning, production planning, and demand fulfilment (2017)A Comparison of Heuristic and Optimum Solutions in Resource-Constrained Project Scheduling (1975)Characterization and Generation of a General Class of Resource-Constrained Project Scheduling Problems (1995)Serial and parallel resource-constrained project scheduling methods revisited: Theory and computation (1996)A survey of variants and extensions of the resource-constrained project scheduling problem (2009)A theory of the temporary organization (1995)A new framework for determining critical success/failure factors in projects (1996)THE LAST PLANNER SYSTEM OF PRODUCTION CONTROL (2000)Resource-Constrained Scheduling of Projects with Variable-Intensity Activities (1990)Project selection with discounted returns and multiple constraints (1996)Effects of marketing‐manufacturing integration on new product development time and competitive advantage (2006)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)Resource leveling in construction by genetic algorithm-based optimization and its decision support system application (2000)
this work references cited by second hop

References

  • 1976Managing high-technology programs and projects375 cited
  • 1982Multi-Project Scheduling: Categorization of Heuristic Rules Performance289 cited
  • 1980Precedence and Arrow Networking Techniques for Construction167 cited
  • 1989A General Framework for Modeling Production165 cited
  • 1986Project Management: Methods and Studies54 cited

Cited by

No citing works inside the corpus for this window.

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work