SZodixStudyAcademic Library
ShelvesOpen access
Study · an open academic library·Metadata from OpenAlex (CC0)·Shelves·OpenAlex metadata, de-duplicated
Optimal schemes for resubmitted lot acceptance using previous defect count data
10 references·3 citing·33 second hop
Optimal schemes for resubmitted lot acceptance using previous defect count data (2015)Optimal schemes for resubmitted lot accep…Optimal Defects-Per-Unit Acceptance Sampling Plans Using Truncated Prior Distributions (2014)Optimal Defects-Per-Unit Acce…A resubmitted sampling scheme by variables inspection for controlling lot fraction nonconforming (2014)A resubmitted sampling scheme…A flexible process-capability-qualified resubmission-allowed acceptance sampling scheme (2014)A flexible process-capability…Risk-embedded Bayesian acceptance sampling plans via conditional value-at-risk with Type II censoring (2013)Risk-embedded Bayesian accept…Developing a sampling plan by variables inspection for controlling lot fraction of defectives (2013)Developing a sampling plan by…A mixed repetitive sampling plan based on process capability index (2013)A mixed repetitive sampling p…Variable sampling inspection for resubmitted lots based on process capability index Cpk for normally distributed items (2012)Variable sampling inspection …Variables sampling inspection scheme for resubmitted lots based on the process capability index Cpk (2011)Variables sampling inspection…Interval censored sampling plans for the gamma lifetime model (2007)Interval censored sampling pl…Sampling inspection for resubmitted lots (1997)Sampling inspection for resub…Efficient truncated repetitive lot inspection using Poisson defect counts and prior information (2020)Efficient truncated repetitiv…Optimal truncated repetitive lot inspection with defect rates (2019)Optimal truncated repetitive …Designing a multiple state repetitive group sampling plan based on the coefficient of variation (2016)Designing a multiple state re…Process Capability Indices (1986)Introduction to Statistical Quality Control (1992)Process Capability Indices. (1995)Lot-dependent sampling plans for qualifying long-term production capability with a one-sided specification (2020)Design and construction of a variables quick switching sampling system based on Taguchi capability index (2021)Robust process capability indices and statistical inference based on model selection (2021)Coherent Measures of Risk (1999)Optimization of conditional value-at-risk (2000)Conditional value-at-risk for general loss distributions (2002)Balancing producer and consumer risks in optimal attribute testing: A unified Bayesian/Frequentist design (2020)An adjustable inspection scheme for lot sentencing based on one-sided capability indices (2021)Optimal repetitive reliability inspection of manufactured lots for lifetime models using prior information (2022)Process Capability Indices—A Review, 1992–2000 (2002)An overview of theory and practice on process capability indices for quality assurance (2008)Developing a variables multiple dependent state sampling plan with simultaneous consideration of process yield and quality loss (2016)Effect of inspection performance in smart manufacturing system based on human quality control system (2017)The construction of a modified sampling scheme by variables inspection based on the one-sided capability index (2018)A Method of Sampling Inspection (1929)Statistical Theory of Sampling Inspection by Attributes. (1984)Variables Sampling Plans for Weibull Distributed Lifetimes Under Sudden Death Testing (2006)Economic lot sampling inspection from defect counts with minimum conditional value-at-risk (2016)Process Capability Indices in Theory and Practice (2000)A modified variables repetitive group sampling plan with the consideration of preceding lots information (2015)Variable-sampling plans based on lifetime-performance index under exponential distribution with censoring and its extensions (2017)Quality Control and Industrial Statistics. (1967)The design of a new repetitive sampling control chart based on process capability index (2015)A control chart for multivariate Poisson distribution using repetitive sampling (2016)Capability-based quick switching sampling system for lot disposition (2017)Chain Sampling Inspection Plan (1977)Design and Construction of a Variables Repetitive Group Sampling Plan for Unilateral Specification Limit (2013)Design of progressively censored group sampling plans for Weibull distributions: An optimization problem (2010)Capability indices for Birnbaum–Saunders processes applied to electronic and food industries (2014)An efficient inspection scheme for variables based on Taguchi capability index (2012)
this work references cited by second hop

References

  • 2011Variables sampling inspection scheme for resubmitted lots based on the process capability index Cpk110 cited
  • 2012Variable sampling inspection for resubmitted lots based on process capability index Cpk for normally distributed items105 cited
  • 1997Sampling inspection for resubmitted lots83 cited
  • 2013A mixed repetitive sampling plan based on process capability index75 cited
  • 2014A resubmitted sampling scheme by variables inspection for controlling lot fraction nonconforming74 cited
  • 2013Developing a sampling plan by variables inspection for controlling lot fraction of defectives53 cited
  • 2007Interval censored sampling plans for the gamma lifetime model47 cited
  • 2014A flexible process-capability-qualified resubmission-allowed acceptance sampling scheme42 cited
  • 2013Risk-embedded Bayesian acceptance sampling plans via conditional value-at-risk with Type II censoring26 cited
  • 2014Optimal Defects-Per-Unit Acceptance Sampling Plans Using Truncated Prior Distributions24 cited

Cited by

  • 2016Designing a multiple state repetitive group sampling plan based on the coefficient of variation12 cited
  • 2019Optimal truncated repetitive lot inspection with defect rates11 cited
  • 2020Efficient truncated repetitive lot inspection using Poisson defect counts and prior information9 cited

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work