Decision Support for Project Management using A Chronographic Approach
16 references·2 citing·28 second hop
Decision Support for Project Management using A Chronographic Approach (2002)Decision Support for Project Management u…An analytical study of the Q(s,S) policy applied to the joint replenishment problem (2004)An analytical study of the Q(…Scheduling Projects with Repeating Activities (1998)Scheduling Projects with Repe…CPM/LOB: New Methodology to Integrate CPM and Line of Balance (1994)CPM/LOB: New Methodology to I…New Generation of Planning Structures (1993)New Generation of Planning St…Ghost: Project Network Generator (1988)Ghost: Project Network Genera…Decision Support Systems: Putting Theory into Practice (1986)Decision Support Systems: Put…Journal of Construction Engineering and Management (1983)Journal of Construction Engin…Construction Project Administration (1978)Construction Project Administ…VPM Scheduling for High-Rise Buildings (1975)VPM Scheduling for High-Rise …An Analytical Study of the PERT Assumptions (1964)An Analytical Study of the PE…Letter to the Editor—Attempts to Validate Certain PERT Statistics or “Picking on PERT” (1962)Letter to the Editor—Attempts…Expected Critical Path Lengths in PERT Networks (1962)Expected Critical Path Length…A NON-COMPUTER APPROACH TO THE CRITICAL PATH METHOD FOR THE CONSTRUCTION INDUSTRY (1962)A NON-COMPUTER APPROACH TO TH…Critical-Path Planning and Scheduling: Mathematical Basis (1961)Critical-Path Planning and Sc…Critical-Path Planning and Scheduling (1959)Critical-Path Planning and Sc…Application of a Technique for Research and Development Program Evaluation (1959)Application of a Technique fo…Continuous Precedence Relations for Better Modelling Overlapping Activities (2015)Continuous Precedence Relatio…A chronographic method for construction project planning (2006)A chronographic method for co…Professional Construction Management (1976)Construction Planning for Linear Projects (1980)Linear Scheduling Method for Highway Construction (1981)Challenges in Line-of-Balance Scheduling (2002)Optimal Planning and Scheduling for Repetitive Construction Projects (2005)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)Planning Support Systems: A New Perspective on Computer-Aided Planning (1997)Knowledge warehouse: an architectural integration of knowledge management, decision support, artificial intelligence and data warehousing (2002)Modelling global risk factors affecting construction cost performance (2003)Impact of Change Orders on Labor Efficiency for Electrical Construction (1999)Causes of delays in Saudi Arabian public sector construction projects (2009)Risk assessment of construction projects (2010)MONTE CARLO METHODS AND THE PERT PROBLEM (1963)Distribution of the Time Through a Directed, Acyclic Network (1965)The use of fuzzy variables in pert (1981)Critical-path planning and scheduling (1959)A Comparison of Exact Approaches for Solving the Multiple Constrained Resource, Project Scheduling Problem (1984)Bounding the Project Completion Time Distribution in PERT Networks (1985)Markov and Markov-Regenerative pert Networks (1986)Resource-constrained project scheduling: Notation, classification, models, and methods (1999)An integrated survey of deterministic project scheduling (2001)A Simulation-Based Process Model for Managing Complex Design Projects (2005)Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Resource-Activity Critical-Path Method for Construction Planning (2003)A review of methods and algorithms for optimizing construction scheduling (2013)Project complexity: The focal point of construction production planning (1996)Delays and cost increases in the construction of private residential projects in Kuwait (2005)Selection of performance objectives and key performance indicators in public–private partnership projects to achieve value for money (2009)
this work references cited by second hop

References

  • 1983Journal of Construction Engineering and Management974 cited
  • 1959Application of a Technique for Research and Development Program Evaluation932 cited
  • 1961Critical-Path Planning and Scheduling: Mathematical Basis902 cited
  • 1986Decision Support Systems: Putting Theory into Practice400 cited
  • 1998Scheduling Projects with Repeating Activities315 cited
  • 1959Critical-Path Planning and Scheduling283 cited
  • 1964An Analytical Study of the PERT Assumptions283 cited
  • 1978Construction Project Administration191 cited
  • 1962Expected Critical Path Lengths in PERT Networks188 cited
  • 1962A NON-COMPUTER APPROACH TO THE CRITICAL PATH METHOD FOR THE CONSTRUCTION INDUSTRY157 cited
  • 1993New Generation of Planning Structures113 cited
  • 1994CPM/LOB: New Methodology to Integrate CPM and Line of Balance112 cited
  • 1975VPM Scheduling for High-Rise Buildings107 cited
  • 2004An analytical study of the Q(s,S) policy applied to the joint replenishment problem84 cited
  • 1988Ghost: Project Network Generator83 cited
  • 1962Letter to the Editor—Attempts to Validate Certain PERT Statistics or “Picking on PERT”

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

76 cited

Cited by

  • 2006A chronographic method for construction project planning29 cited
  • 2015Continuous Precedence Relations for Better Modelling Overlapping Activities25 cited