Optimal Repetitive Scheduling Model with Shareable Resource Constraint
8 references·13 citing·31 second hop
Optimal Repetitive Scheduling Model with Shareable Resource Constraint (2001)Optimal Repetitive Scheduling Model with …Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems (1997)Using Genetic Algorithms to S…CPM/LOB: New Methodology to Integrate CPM and Line of Balance (1994)CPM/LOB: New Methodology to I…RPM: Repetitive Project Modeling (1990)RPM: Repetitive Project Model…Scheduling project networks with resource constraints and time windows (1988)Scheduling project networks w…Extensions to Linear Scheduling Optimization (1988)Extensions to Linear Scheduli…Line‐of‐Balance Scheduling in Pavement Construction (1986)Line‐of‐Balance Scheduling in…Simulation Modeling and Analysis. (1983)Simulation Modeling and Analy…Linear Scheduling Method for Highway Construction (1981)Linear Scheduling Method for …Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects (2019)Multipurpose linear programmi…The Multimode Resource‐Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects (2018)The Multimode Resource‐Constr…Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects (2017)Opposition multiple objective…Resource Leveling in Line-of-Balance Scheduling (2013)Resource Leveling in Line-of-…Group Decision Making for Stochastic Optimization of Time, Cost, and Quality in Construction Projects (2012)Group Decision Making for Sto…GA optimization model for repetitive projects with soft logic (2011)GA optimization model for rep…Optimizing the utilization of multiple labor shifts in construction projects (2010)Optimizing the utilization of…Resource-constrained scheduling for continuous repetitive projects with time-based production units (2009)Resource-constrained scheduli…Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects (2008)Hybrid Time-Cost Optimization…Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/unconstrained resources (2008)Finding the shortest path wit…Optimization model for resource assignment problems of linear construction projects (2006)Optimization model for resour…Optimized Scheduling of Linear Projects (2003)Optimized Scheduling of Linea…Application of genetic algorithms to construction scheduling with or without resource constraints (2002)Application of genetic algori…Construction Planning for Linear Projects (1980)Comparison of Linear Scheduling Model and Repetitive Scheduling Method (2003)Work Continuity Constraints in Project Scheduling (2005)LOB and CPM Integrated Method for Scheduling Repetitive Projects (2012)Modern Construction Management (2012)Activity networks: Project planning and control by network models (1977)Semi-active, active, and non-delay schedules for the resource-constrained project scheduling problem (1995)A branch and bound algorithm for the resource-constrained project scheduling problem (1998)A Constraint-Based Method for Project Scheduling with Time Windows (2002)Critical-Path Planning and Scheduling: Mathematical Basis (1961)Applying a Genetic Algorithm-Based Multiobjective Approach for Time-Cost Optimization (2004)Genetic Algorithm–Based Method for the Deadline Problem in Repetitive Construction Projects Considering Soft Logic (2016)Tradeoff time cost quality in repetitive construction project using fuzzy logic approach and symbiotic organism search algorithm (2021)Linear Scheduling Model: Development of Controlling Activity Path (1998)Optimizing Resource Utilization for Repetitive Construction Projects (2001)Optimal Planning and Scheduling for Repetitive Construction Projects (2005)Schedule control model for linear projects based on linear scheduling method and constraint programming (2013)Scheduling Optimization of Linear Schedule with Constraint Programming (2017)Application of Linear Scheduling (1986)A genetic algorithm-based method for scheduling repetitive construction projects (2009)Cost Optimization in Projects with Repetitive Nonserial Activities (2001)The discrete time/cost trade-off problem: extensions and heuristic procedures (2007)Resource-driven scheduling of repetitive activities (1998)Effect of learning on line-of-balance scheduling (2001)Optimization of Resource Allocation and Leveling Using Genetic Algorithms (1999)Time-Cost-Quality Trade-Off Analysis for Highway Construction (2005)Efficient Repetitive Scheduling for High-Rise Construction (2008)Genetic algorithm-based multi-objective model for scheduling of linear construction projects (2008)Testing ecological models: the meaning of validation (1996)Developing Theory Through Simulation Methods (2007)Verification and validation of simulation models (2012)
this work references cited by second hop

References

  • 1983Simulation Modeling and Analysis.8,697 cited
  • 1997Using Genetic Algorithms to Solve Construction Time-Cost Trade-Off Problems504 cited
  • 1988Scheduling project networks with resource constraints and time windows375 cited
  • 1990RPM: Repetitive Project Modeling176 cited
  • 1981Linear Scheduling Method for Highway Construction159 cited
  • 1986Line‐of‐Balance Scheduling in Pavement Construction148 cited
  • 1994CPM/LOB: New Methodology to Integrate CPM and Line of Balance112 cited
  • 1988Extensions to Linear Scheduling Optimization101 cited

Cited by

  • 2006Optimization model for resource assignment problems of linear construction projects82 cited
  • 2011GA optimization model for repetitive projects with soft logic76 cited
  • 2002Application of genetic algorithms to construction scheduling with or without resource constraints73 cited
  • 2017Opposition multiple objective symbiotic organisms search (OMOSOS) for time, cost, quality and work continuity tradeoff in repetitive projects69 cited
  • 2018The Multimode Resource‐Constrained Project Scheduling Problem for Repetitive Activities in Construction Projects67 cited
  • 2008Finding the shortest path with honey-bee mating optimization algorithm in project management problems with constrained/unconstrained resources

Only edges whose both ends are imported exist here. Widen the year window, or show the whole map. Back to the work

65 cited
  • 2019Multipurpose linear programming optimization model for repetitive activities scheduling in construction projects63 cited
  • 2003Optimized Scheduling of Linear Projects59 cited
  • 2013Resource Leveling in Line-of-Balance Scheduling55 cited
  • 2012Group Decision Making for Stochastic Optimization of Time, Cost, and Quality in Construction Projects52 cited
  • 2008Hybrid Time-Cost Optimization of Nonserial Repetitive Construction Projects42 cited
  • 2009Resource-constrained scheduling for continuous repetitive projects with time-based production units38 cited
  • 2010Optimizing the utilization of multiple labor shifts in construction projects36 cited